AOP2 Flashcards

1
Q

State Vessel level for reduced inventory entry condition

A

-36”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

State Vessel level and RHR flow restriction

A

Before lowering vessel level to below -78” RHR flow must be limited to 1600 GPM by throttling RH-V-14 & 26

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

State requirement for RCS Intact

A

RV head installed and tensioned, SG primary manways installed, PZR manway installed, PZR PORV’s and safeties installed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

State vessel level for Mid Loop

A

RCS water level is lower than the top of the flow area at the junction of the hot legs with the reactor vessel. At Seabrook this is - 71”.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When are SI accumulators isolated

A

RCS temp prior to 350F

RCS Press <1000#

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

State RHR pump Shutdown requirement during a SD LOCA (include adverse containment numbers)

A

PZR level <7% (28% if adverse)
- OR -
RCS subcooling <40F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

State RCP trip Requirement during a SD LOCA (include adverse containment numbers)

A
PZR level <7% (28% if adverse)
- OR -
RCS subcooling <40F
- OR -
RCP seal DP <220#
- OR -
RCP seal leak off less than required
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

State Mode 4 T.S. action Statement for loss of ECCS

A

With no ECCS subsystem OPERABLE because of the inoperability of either the centrifugal charging pump or the flow path from the refueling water storage tank, restore at least one ECCS subsystem to OPERABLE status within 1 hour or be in COLD SHUTDOWN within the next 20 hours.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

State Rx trip criteria for loss of SCCW

A

If at least one pump can not be started then trip the Rx

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

State how to control SCCW pump amps when on 1 pump

A

Throttle the running pump discharge valve

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

State Rx trip criteria for loss of IA

A

If a loss of plant control occurs then trip the Rx

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

State when SA header can be restored

A

When SA # is >95# then open SA-V-92/93

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

State entry to GSU Trouble

A

ISO NE notifies Seabrook of a Kp7 or higher

Florida TPDC notifies Seabrook of a Kp7 or higher (TPDC will notify at a 6 but entry is not required)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

State GSU trouble Rx trip Criteria

A

Hot spot winding temp >110C and GSU oil temp alarm limit is exceeded
- OR -
DC Neutral Ground Current limit is exceeded

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

State Load reduction Criteria for GSU trouble

A

Hot Spot Winding Temp >100C
- AND -
GSU Oil Temp High reset
–> reduce load at 120%/HR in 10% increments

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

State major equipment lost on loss of SWG-12A

A

EBOP
ESOP
AR-P-50A/B suction valves fail close
Loss of runback

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

State major equipment lost on loss of SWG-12B

A
CS-V-145 fails closed
RCS Make up
AR-P-50C suction valve fails close
Loss of steam dumps
RC-LCV-460/459 - fail close
18
Q

State Rx trip Criteria on high SG pressure

19
Q

State actions if H2 pressure is not normal and seal oil pumps are not working

A

Trip Rx (turbine)

20
Q

State indications of CBS check valves leakage

A

Suction pressure/temp high

High heat up rate in suction line (6F/min = gross failure)

21
Q

State NRC notification for loss of RHR cooling

A

8 HRs per 10 CFR 50.72

22
Q

State alternate method for sweeping air out of lines in the RHR system

A

fill vessel above -71”

Run a RHR pump at greater than 2285 GPM

23
Q

State vessel level where a RHR pump can be started

A

-83.5” and stable or rising

24
Q

State the rate of decrease for cavity level if the seal is leaking

A

2”/min with transfer valve closed
- OR -
1”/min with transfer valve open

25
For a loss of SF pool level state the preferred order of make up
Gravity feed from the RWST Gravity Feed from CST Fire Protection
26
State normal level of SFP and Bottom of skimmer
Normal: 25.4' Bottom: 25.1'
27
State caution for restoring SFP cooling during an ECCS actuation
If in ECCS recirc mode with only 1 train the PCCW system may be 120F and restoration to the SFP should be delayed for up to 4hrs
28
State basis for having CRFRM
Keep the CR <5Rem to CROs for up to 30 days
29
State EFW TS 3.7.1.2 action d
With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.
30
State Rx trip criteria for Turbine Building Flooding
``` If water level can not be maintained below the grating --> Trip the Rx When immediate actions are complete --> Place all CW pump CS in PTL Close MSIVs and bypass valves ```
31
State required rate of down power in Turbine building flooding
25%/hr
32
State required SW flow to EDG HX
900GPM on ocean | 1800 GPM on CT
33
State Rx trip criteria for degraded vital AC
If power can not be restored to at least one AC Bus --> trip the Rx Go to ECA-0.0
34
State impact on plant control on a loss Vital DC Bus
Remote control capability is removed, local action is required
35
State HELB alarm set point
120F
36
State HELB Valves
CS-V-149/150 SB-V-1/3/5/7 and 9/10/11/12 AS-V-175/176
37
Per OP 9.2 state what NOTES do
NOTES contain administrative or advisory information which supports operator action
38
Per OP 9.2 state what CAUTIONS do
CAUTIONS contain information about potential hazards to personnel or equipment. They also advise on actions or transitions which may become necessary depending on changes in plant conditions
39
State operator action on a status tree orange or red path
indications should be validate using hardwires
40
State direct entry into the EOPs
E-0 - OR - ECA-0.0
41
State when FRPs should not be implimented
While in ECA-0.0 FRPs should not be implemented and not until power is restored to an E-Bus and initial status checks are performed.
42
State which human performance tools should always be used in transient situation
STAR Three way communication Procedure use and place keeping