API-570 "WHO DOES IT" (by perosn) Flashcards

0
Q

Evaluate and accept NDE examinations results

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Assure Owner- testing, Inspection & examination activities meet code

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Get familiar with prior inspections data & repairs prior to inspections

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Get familiar with operating conditions & potential damage mechanisms of pipe system

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Select or adjust the number of CML’s

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Verify that new alloy material during repairs & alteration meet specifications

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If incorrect material found in existing piping, determine amount of further verification

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Periodically inspect components found during PMI survey that are wrong materials

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Determine if crack-like weld flaws are the result of original weld fabrication

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Asses preferential weld corrosion

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Review and approval an interval deferral

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Revise and existing interval and document basis for change

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Authorize ALL repairs

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Designate hold points for repairs and alterations

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Provide general authorization for limited or routine repairs

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Provide general authorization for limited or routine repairs

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Approve ALL repair & alteration work at hold points

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Approve ALL repairs and alterations work at completion of work.

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Determine that wall thickness is adequate for ON-Stream welding

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Check preheat temperature when using Preheat in lieu of PWHT

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Determine whether a pressure test is needed after repairs

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Perform UT flaw detection for finding linear flaws

A

QUTE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Perform UT as a substitute for pressure test

A

QUTE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Prior to hydrotest determine if structure will support weight

A

E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Determine risk of brittle fracture prior to performing a pressure test

A

E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Approve repair welding of cracks

A

E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Design temporary repairs

A

E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

Determine Longitudinal cracks won’t grow beyond a FW patch

A

E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Approve using lap patches with a material different than the pipe

A

E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

Allow temporary welded repairs to remain in place past “next opportunity “

A

E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

Allow temporary leak sealing devices to remain in place past “next opportunity”

A

E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

Allow exceptions to required preheat temperature for temporary repairs

A

E

32
Q

Review the use of preheat in lieu of PWHT.

A

E

33
Q

Exceptions to PWHT on temporary repairs

A

E

34
Q

Review the use of a local PWHT in lieu of a full encirclement PWHT

A

E

35
Q

Overall responsibility for complying with API-570

A

O

36
Q

Responsibility for developing and implementing a QA inspection/repair management system

A

O

37
Q

Responsibility for implementing an effective MOC process

A

O

38
Q

Choose to conduct RBI assessments

A

O

39
Q

Assure individuals taking thickness measurements are trained and qualified

A

O

40
Q

Determine pressure for leak tests (non-code tests)

A

O

41
Q

When verifying new materials, determine the sampling percentage

A

O

42
Q

Determine if PMI program is needed for existing facilities

A

O

43
Q

Maintain a record of process fluid classifications

A

O

44
Q

Maintain piping records

A

O

45
Q

Approve use of on-stream welding

A

O

46
Q

Also involved in making inspections plans for pipe that operates >750 *F

A

CS

47
Q

Involved if the # of CML’s will be significantly reduced or eliminated

A

CS

48
Q

Select CML’S for pipe systems subject to localized corrosion or cracking

A

CS

49
Q

Responsibility for QC during repairs or alterations

A

Repair Org.

50
Q

Perform piping repairs

A

Repair Org.

51
Q

Maintain record of qualified WPS’S and WPQ’s

A

Repair Org.

52
Q

PRD’s tested and repaired

A

experienced Repair Org.

53
Q

Determine surface prep for NDE exam. INSPECTOR MADE NEED TO CONSULT WITH:

A

GURU

54
Q

Perform audit of owner/users to assure compliance with 570

A

Competent

55
Q

Maintain certification records of NDE examiners

A

Exam Employer

56
Q

Make corrections based on the audit of Owner/User piping program

A

Owner’s AIA

57
Q

Approve substituting NDE for a pressure test

A

AND

I & E

58
Q

Review and approve RBI assessments

A

AND

I & E

59
Q

Authorize all alterations

A

AND

I & E

60
Q

Authorize all alterations

A

AND

I & E

61
Q

Approve substituting NDE in lieu of a pressure test

A

AND

I & E

62
Q

develop an inspection plan for a piping system

A

AND

I & E

63
Q

Determine date to replace incorrect materials found during PMI survey

A

AND

I & O & CS

64
Q

Determine cause if short-term corrosion rate varies significantly

A

AND

I & CS

65
Q

Select corrosion rate that best reflects conditions

A

AND

I & CS

66
Q

Approve all proposed methods of design, materials, WPS,s, NDE & testing

A

OR

I or E

67
Q

Review leak sealing procedures

A

OR

I or E

68
Q

Perform rerating calcs

A

OR

I or E

69
Q

Perform On-stream inspections

A

OR

I or Tech

70
Q

Perform thickness inspections

A

OR

I or tech

71
Q

Asses crack-like flaws and environmental cracking

A

OR

E or CS

72
Q

Determine need for non-thickness NDE techniques. Inspector consults with:

A

OR

E or CS

73
Q

Revise an existing interval that has unusual degradation issues. INSPECTOR AND:

A

OR

E or CS

74
Q

Revise an existing interval that has unusual degradation issues. INSPECTOR AND:

A

OR

E OR CS

75
Q

Determine the inspections intervals

A

OR

I or O

76
Q

PMI new materials during repairs & alterations

A

OR

I or Tech

77
Q

Perform external inspections

A

OR

I or qualified other

78
Q

Determine the Inspection intervals for PRD’S

A

OR