API-570 who does it (in order of code) Flashcards

0
Q

Overall responsibility for complying with API-570

4.1

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Overall responsibility for complying with API-570

4.1

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Responsible for developing & implementing QA insp./repair management system

4.3.1.1

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Responsible for QC during repairs or alterations

4.3.3

A

Repair Org

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Responsible for implementing an effective MOC process

4.3.1.2

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Assure owner - Testing, inspection and examination activities meet code

4.3.4

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Evaluate And accept NDE examination results

4.3.4

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Maintain certification records of NDE examiner’s

4.3.5.3

A

Exam Employer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Develop an inspection plan for a piping system

5.1.11

A

And/ Or

I or E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Also involved in making Inspection plan for pipes that operates greater (<) than 750° F

5.1.1.1

A

CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Choose to conduct RBI assessments

5.2

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Get familiar with prior inspection data and repairs prior to inspections

5.3.5

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Get familiar with operating conditions and potential damage mechanism for pipe system

5.4.1.2

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Perform onstream inspections

5.5.2

A

Or

I or tech

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Perform thickness inspections

5.5.3

A

Or

I or tech

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Assure individuals taking thickness measurements are trained and qualified

5.5.3

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Determine cause if short-term corrosion great very significantly

5.5.3

A

And

I & CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Perform external inspections

5.5.4

A

Or

I or qualified other

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Involved if the number of CML’ s will significantly reduced or eliminated

5.6.2

A

CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Select or adjust the number of CML’ s

5.6.3

A

CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Select CML’S for pipe systems subject to localized corrosion or cracking

5.6.3

A

CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Determine need for non-thickness NDE techniques Inspector consults with

5.7.2

A

OR

E, CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Determine surface prep for the NDE exam Inspector made need to consult with

5.7.3

A

GURU

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Perform UT flaws detection for finding linear flaws

5.7.4

A

QUTE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Determine pressure for leak tests (non-code tests)

5.8

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Prior to Hydrotest determine if structure will support weight

5.8

A

E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Determine risk of brittle fracture prior to performing a pressure test

5.8.3

A

E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

Approve substituting NDE FOR a pressure test

5.8.5

A

AND

I & E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Perform UT as a substitute for a pressure test

5.8.5

A

QUTE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

Verify that new alloy material during repairs & alteration meet specifications

5.9

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

When verifying you materials, determine the sampling percentage

5.9

A

O

31
Q

PMI New materials during repairs and Alterations

5.9

A

Or

I Or tech

32
Q

If incorrect material found in existing pipe, determining amount of further verification
5.9

A

I

33
Q

Determine if PMI program is needed for existing facilities

5.9

A

O

34
Q

Determined date to replace incorrect Materials found during amount survey

5.9

A

And

I,O & CS

35
Q

Periodically inspect components found during PMI survey that are wrong materials

5.9

A

I

36
Q

Determine if Crack- like weld flaws are the result of original weld Fabrication

5.11

A

I

37
Q

Asses crack- like flaws and environmental cracking

5.11

A

Or

E or CS

38
Q

Asses preferential weld corrosion

5.11

A

I

39
Q

Perform audit of Owner/Users to assure compliance with 570

5.13

A

Competent person

40
Q

Make corrections based on the audit of Owner/Users piping program

5.13.

A

Owner’s AIA

41
Q

Review and approve RBI assesments

6.3.2

A

And

I & E

42
Q

Determine the inspection intervals

6.3.3

A

Or

I or O

43
Q

Maintain a record of process fluid classification

6.3.4.1

A

O

44
Q

PRD’s tested and repaired

6.7.1

A

Experienced Repair Organization

45
Q

Select corrosion rate that best reflects conditions

7.1.1

A

And

I & CS

46
Q

Maintain piping records

7.6.1

A

O

47
Q

Review and approval an interval deferral

7.10

A

I

48
Q

Revise an existing interval and document basis for change

7.10

A

I

49
Q

Revise and existing interval that has usual degradation issues Inspector and????

A

Or

E or CS with including the inspector

50
Q

Perform piping repairs

8.1.2

A

Repair organization

51
Q

Authorize all repairs

8.1.2

A

I

52
Q

Authorize all alterations

8.1.2

A

And

I & E

53
Q

Designates hold points for repairs and alterations

8.1.2

A

I

54
Q

Provide general authorization for limited or routine repairs

8.1.2

A

I

55
Q

Approve all proposed methods of the design, materials, WPS’s, NDE & testing

8.1.3

A

Or

I or E

56
Q

Approve use of on-stream welding

8.1.3

A

O

57
Q

Approved repair welding of Cracks

8.1.3

A

E

58
Q

Approve all repair and alteration work at hold points

8.1.3

A

I

59
Q

Approve all repair and alteration work at completion of work

8.1.3

A

I

60
Q

Design temporary repairs

8.1.4.1

A

E

61
Q

Determine longitudinal cracks won’t grow beyond a FW patch

8.1.4.1

A

E

62
Q

Approve using lap patches with a material different than the pipe

8.1.4.1

A

E

63
Q

Determine that wall thickness is adequate for on-stream welding

8.1.4.1

A

I

64
Q

Allow temporary welded repairs to remain in place past “next opportunity”

8.1.4.1

A

E

65
Q

Allow temp. devices to remain in place past “next opportunity”

8.1.5

A

E

66
Q

Review leak sealing procedures

8.1.5

A

Or

I & E

67
Q

Maintain record of all WPS’s & WPQ’S s

8.2.2

A

Repair organization

68
Q

Allow exceptions to required preheat temperature for temporary repairs

8.2.3.2

A

E

69
Q

Check preheat temperature when using Preheat in lieu of PWHT

8.2.3.2.

A

I

70
Q

Review the use of Preheat in lieu of PWHT

8.2.3.2

A

E

71
Q

Exceptions to PWHT on temporary repairs

8.2.3.3

A

E

72
Q

Review the use of a local PWHT in lieu of a full encirclement PWHT

8.2.3.3

A

E

73
Q

Determine whether a pressure test is needed after repairs

8.2.7

A

I

74
Q

Approve substituting NDE in lieu of a pressure test

8.2.7

A

And

I & E

75
Q

Perform rerating calc’s

8.3

A

OR

I & E