Building Components (IDPX/PRAC) Flashcards
Soiled core doors have a fire rating of what?
20, 45 or 90 minute
Hollow core doors have fire rating of what?
None
Door components diagram
Wood door frames have a fire rating of what?
20, 30 or 45 min
Metal door frames have a fire rating of what?
1-hr
What type of door frame is used in commerical construction?
Steel (door and frame)
Hollow metal door
Alumunium frames have a fire rating of what?
20 min
Not recommended for anything over 20 min rating
Can glass doors be used where fire ratings are required?
NO
unless they are tempered and meet code req.
If a wall has a 1hr rating what does the door need to be?
20 min
If the occupancy space is rated at 1hr, what is the door rating?
3/4 hr
Where are lever passage sets used?
- Non-sensitive areas
- Private offices
- Closets
- Pantires
- When security is not needed
Not lockng
Where are lever locksets used?
- Restrooms
- Anywhere locks are needed for a space
- Not FR
Locking
Where are locksets with panic bar AND closer used?
- Required by building code
- Assembly over 750 sqft
- Means of egress
Locking
Where are lever lockset with closers used?
- FR partitions that need locking
Locking
Where are lever passage set with closers used?
- FR partitions that do not require locking
- Training rooms
Not locking
Where are dummy set with magnetic latch used?
- Closets and cabinets where there is no need to turn a handle
Not locking
Where are code locks with closers used?
- Storage rooms
- Copier rooms
- Any room that needs to be secured
- NOT usable on emergency doors
Locking
Where are lever passages sets with mag locks, closers and card readers used?
- Entrances into suites
Locking
Where are lever passage set with mag locks and door readers used?
- Enterances into suites that DO NOT require FR
Locking
What dimension are residental studs located at?
16” OC
What dimension are commerical studs located at?
24” OC
Level of Finishes
When is level 0 used?
Temporary construction or undetermined finish
Level of Finishes
When is level 1 used?
- Plenums above ceiling
- Areas concleaded or not open to public traffic
Level of Finishes
Where is level 2 use?
- Backing board or substrate
- Areas where final surface apppearance is not a concern