C9.2 Excavation Flashcards

1
Q

Methods to avoid excavation

A

micro tunnelling
directional drilling
impact moling
pipe bursting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

CDM reg 22

A

Steps to be taken to prevent danger to any person

protection from collapse
protection from material falling in
protection from people / equipment falling in
prevent surrounding ground being overloaded

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

excavation hazards

A
collapse of sides
equipment / material falling in
people falling in
flooding
gases / explosion - methane build up
fumes -  contaminated ground
collapse of nearby structures / under mined foundations
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

measures to support excavation sides

A

trench box
shoring
steel sheets / piles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

measures to prevent collapse of nearby structures

A

shoring / supports

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

measures to prevent falling in

A

guard rails
lit at night
stop blocks / sleepers
covers over shallow trenches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

excavation inspection reports

A

by competent person
completed within 24 hrs
report kept on site
conduct weekly if no adverse event

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

contents of excavation inspection report

A
name / address of person inspection was done for
location of work
description of work
date / time of inspection
details of any H&S issues
details of any action taken
details of further required action
name / position of person writing report
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

underground services

A
gas
electric
sewerage
other pipes - oil, chemical, petrol
fibre optics
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

excavation SSW

A
planning
avoidance of services
protection / support of services
material handling
waste
public protection
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

how to detect services

A

plans - may be out of date
detection devices
CAT scanner (cable avoidance tool)
ground penetrating radar

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

measures to protect underground services

A
detect
re-route
support
hand dig within 0.5 metres with insulated hand tools
fencing
hung up
labelled
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

mechanisms for excavation collapse

A
loose soil
water logged
heavy plant too close
vehicles cause vibration
inadequate support
excavation below level of shoring
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

mechanisms for falls of people / items into excavations

A
materials too close to edge
excavation too close to building
excavation edge not clear
no barriers
no lighting
poor position / lack of ladders
unsuitable / no vehicle ramps
no stop blocks
vehicles too close
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

measures to control water ingress

A

pumps
advice from EA
if within 10 metres, Consent for Works Affecting Watercourses from EA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

CDM Reg 31

A

start of shift inspections by competent person
inspections after any event that might affect stability of excavation
inspections after any material fall

no work if adverse inspection findings until fixed

17
Q

considerations ref shoring

A

subsoil - if wet, use metal sheets
duration of works - trench / drag box for short duration
type of work - trench / drag box for pipe work
minimise length of excavation trench
flooding risk
excavation depth
number of people in excavation hole at any time

18
Q

360 degree excavator hazards

A
impact with pedestrian / vehicle from swinging boom 
impact from bucket
contents falling from bucket
hydraulics under pressure
overturn
contact with overhead power lines
19
Q

360 degree excavator control measures

A
trained users
not overloading
maintenance / inspection
pedestrian segregation
signage
driver visibility aids - cameras / mirrors
high viz
roll over & cab impact protection 
seatbelts
20
Q

contents of a permit to dig form

A
principal contractor name
sub contractor name
permit number
date
location
size /depth
service plans yes/no
cable locating equipment yes/no
services marked out yes/no
trial holes needed yes/no
precautions for overhead power yes/no
sketch / copy of plans
date / time of excavation
signed by issuer and receiver