Case Study Flashcards
How did you deal with correction of errors in priced tender documents?
Why did you choose the JCT intermediate building contract over the minor works building contract and what are the key differences?
Tell me about the contents of the pre construction pack?
How do you evaluate tenders and select a contractor?
How do you ensure that the tendering process was fair?
What advice did you give the client about Insurance under the JCT Intermediate Building Contract?
What is the purpose of the Joint Names Insurance Policy under the JCT Intermediate Building Contract?
How did you document or record the client’s brief?
What were some of your duties as principal designer?
What documentation would you produce as a principal designer under CDM 2015?
What steps did you take to identify, eliminate or mitigate any health and safety risks associated with the design?
How did you ensure that the design complied with any relevant industry standards or best practices?
How did you manage the design process?
Why did you undertake bi-weekly inspections?
How do you ensure compliance with health and safety regulations during a site inspection?
What should be included in a site inspection report?
How did you provide accurate weekly reports to stakeholders if you only attended site on a bi-weekly basis?
Why would an asbestos consultant be required for removal of windows?
Other than fire rated plasterboard, what other alternative method could you have adopted to infill the window opening?
How do you determine the appropriate materials for infilling windows?
What are the key considerations when infilling windows?
What are the potential issues with infilling windows in the mannerrecommended?
What is the difference between a Relevant Event and a Relevant Matter in a building contract?