Ch. 10 Reading Buildings: How to Size Up a Building Flashcards

1
Q

When does size up begin

A

During pre planning and when driving around

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Two types of size up

A

The initial-180

The expanded-360

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Should you always do a 360

A

Yes, unless you have a good exception

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What should the size up include, for the building?

A
The general use and size classification
Basic construction, era, features
Building status
What is burning
The foreground clock
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

First clue of size up is

A

Address

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

5 sub groups of occupancy for rapid street guide

A

Single Family dwelling. Institutional
Multi family dwelling. Public assembly
Main Street commercial. Misc building
Mfr/warehouse
Office/hotel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

For the Main Street commercial, you should probably announce what in size up?

A

The actual business type, strip mall, retail store, eatery

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Manufacturing/warehouse by defn does not allow and can involve what?

A

The general public

Hazardous material

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Institutional includes what types of businesses?

A

Schools, jails, courts, hospitals,

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Public assemblies can be what size and include?

A

Small to medium sized and include restaurants and churches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are some buildings in the Misc category?

A

Grain silos
Telephone exchange
Kit buildings
Utility substations, toll plazas

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

For the 360 size up, what will the good officer scan for?

A

Building construction considerations
Smoke and fire conditions
Status of building( are people there)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The initial size up includes a brief judgement on:

A

Building size
Apparent use
Obvious fire and smoke conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What’s the best hand held light source for size up?

A

Flood style hand light, not pencil beam
Or lantern

Allows to see more features and refract off of smoke

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Modern town homes are most likely from what era?

A

Lightweight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Dwellings with centrally located fireplaces are from what era?

A

Industrial and or historic

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Dwellings with attached or adjoining garages with small doorways are from what era

A

Prior to Industrial

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Commercial buildings with arched, bridge truss or sawtooth roofs are probably from what era?

A

Prior to post WWII-legacy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Unreinforced masonry is from what era?

A

Prior to pre WWII industrial

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Exposed rafter tails of 2x4’s are from:

A

Engineered LW era

21
Q

Long Windows, rolling doors and pilasters mean:

A

Wide open interior and early collapse possible

22
Q

4 building status classifications

A

Occupied
Unoccupied
Vacant
Abandoned

23
Q

How should you treat residential buildings for status?

A

As occupied unless reliable info proves otherwise

24
Q

What can a large white X across a red background mean on a building?

A

Abandoned building that is too dangerous structurally for interior firefighting

25
What does one slash on a background mean?
The building might be sound, but interior ops should be limited to a quick search by permission from IC
26
Why should you always carry a pike pole?
To determine what is burning. Pull ceiling, take a look
27
What is burning?
Structural members?
28
Turn back time for lightweight and conventional exposed structural members
Lightweight- 5 minutes Conventional-15-20
29
Define foreground clock by the author's standards.
Once personnel are on scene, how long will it take to make a visible impact on the fire?
30
For his foreground clock, what 5 tasks are to be accomplished?
``` Exit and PPE Conduct a 360 Deploy hose/water Force entry Move water and get it to the fire ```
31
3 factors that will work against you at a fire.
Gravity The fire is weakening the building Water weighs 8.35 lb per gallon
32
National average for collapse of lightweight wood trusses?
5-7 minutes
33
How does a building on fire affect the fire ground clock if it was burning when you pulled up?
Add that to the known fireground implementation clock
34
6 tactical challenges for buildings
``` Fire spread Collapse Forcible entry Ventilation Search Specific hazards ```
35
3 factors that determine fire spread
Internal geometry of the building The fire load The heat and intake (flow path)
36
2 odd signs of collapse:
Doors out of plumb | Water flowing out of the building that doesn't match amt going in
37
Collapse is an algorithm of :
Construction method Fire Heat exposure Elapsed time
38
Forcible entry is a two part operation that consists of:
Forcible entry and forcible exit
39
In regard to Search as a tactical challenge, what has changed?
Society changed the fire (high heat, explosive gases) and society changed the building (LW and air tight)
40
How long can a person survive in 300 degrees?
1 minute
41
What do heat cracked Windows and high velocity smoke indicate?
A non survivable room
42
8 specific hazards that effect tactics:
``` Storage of Hazardous materials Hoarding Multiple overhead lines Access/egress Previous fire and collapse Aging Windowless bldg Multiple entry levels or sloping grade ```
43
3 primary hazards of Facades
LW material Common attic on the exterior and may be to the attic They can collapse over an entry or exit
44
What are the game changing hazards?
``` Green movement Base of operations Facades Access/egress Building name/utilities ```
45
Who has the role to triage and predict collapse on a fire?
The person assigned to continually read the building (IC or Safety)
46
Triage can set the stage for predicting what?
Partial Localized And general collapse
47
What are the two questions asked in Joe's Triage BS?
When not to enter a Bldg | When to get out
48
In Chapter 10 fucktard decides to say how far a collapse zone should be for unreinforced masonry construction. It is now
3 times the height. Fucker