Ch. 13-16 Flashcards

(32 cards)

1
Q

Perfomance control sytem

A
  1. setting realistic goal. 2. 3. Monitoring and tracking results 4. Variance reports 5 Taking corrective action
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Production rate

A

3600/ cycle time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

manhours per pc

A

( cycle time x number of operators) / 3600 sec/hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Manhours per pc is the same as

A

Labor standard and earned time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

In PCS how much in % do individual lines need to report to be considered for variance reporting

A

70 %

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Machine Maintance problems, managementemt problems, and poor time standards are all examples that need.

A

Corrective Action

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When performance does not live up to it goals what forms

A

A Variance report.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Performance control system is a motion and times study that

A

Affects more people than any other time study application

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Standard time is attainable true or false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

A tool to measure the process or assembly line, not necessarily the operator.

A

Efficiency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What should not be included in standard time

A

Material outage and man downtime

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

An operator will produce a number of units in a given time period. This is called

A

Actual time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Earned time

A

Standard time x number of pcs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Actual time

A

Number of hours x number of operators

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

aims to rectify a task or problem. Called

A

Corrective action

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Plotting results against a horizontal line

A

Tracking also Called graphing

17
Q

A single trend in tracking

A

Is not important

18
Q

What is tracking also called

19
Q

Of zo have an x amount of time in an hour for a break. How would we calculate the production rate for that hour

A

What is x %? Multiply that by the standard production rate you got form normal todm

20
Q

What does each job on the variance report turn into.

A

Project for corrective action

21
Q

3 ways of payment

A

Bonuses and profit sharing. Commissions. Salaries

22
Q

8 basic time management

A

Creative, selective, delegate, Do it Know, Respect other people’s time, don’t rationalize

23
Q

What is a good time management attitude

A

Knowing what your time is worth.

24
Q

What should you not expect your supervisor to do?

A

everything for you. respecting other people’s opinions.

25
who does Ie work with it?
Everyone
26
3 steps to reduce costs
eliminate unnecessary, combine/reragee jobs,s, simplify.
27
most important attitude for production managers
cost consoisuneses
28
what does lean manufacturing understand and promote for cost reduction
training employees.
29
two areas of expertise we can share with others
Motion and cost consciousnesses.
30
what will happen when you have data?
you will be challenged
31
Always try to promote
productivity
32