CHAP5 Engine Company Chauffeur Flashcards

(32 cards)

1
Q

The first due engine company should strive to enter the block ahead of?
2.3

A

1st ladder company, and from the same direction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The term in line pumping refers to any situation in which?
2.7.1

A

3 1/2 inch hose is used to connect to a hydrant.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

In line pumping is not exclusive to a situation with a hydrant before the fire building and can be used regardless of the position of the —— or ——.
2.7.2

A

Hydrant or apparatus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

If intake pressure drops below —— psi , the ECC must have their water supply augmented.
2.7.3

A

Below 15 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Later, arriving engine company should attempt to position their apparatus is so the ——- is facing the direction of the operation. 2.8.3.

A

Backstep

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Later arriving engine companies should ensure two ladder companies are on the block before entering ——- streets that could possibly leave ladder apparatus blocked out from the fire building.
2.8.2

A

Narrow streets 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

After the hydrant is properly flushed out, it must be ———- —— for proper pressure.
3.1.2

A

Flow tested
This is done by opening the hydrant until sufficient water flow under pressure is observed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

10 foot soft suction is —— soft suction has 4 1/2 inch couplings and requires accurate positioning close to the hydrant.
3.2.1

A

3 1/2 soft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

35 foot soft connection 5 inch synthetic hose also with 4 1/2 inch couplings. It provides the largest flow of any hydrant connection. But has the potential to ———
3.2.3

A

Kink
Needs to be properly flaked out

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

3 1/2 inch hose supply. The rig comes in 50 foot lengths. It allows a great ——- what provides the ——- water flow.
3.2.4

A

Great flexibility
Least water flow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

If the ECC cannot hook up to a positive water source transmit a signal 10-70 via a HT and department radio.
The ——- should be used.
3.6.1

A

EAB

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When a relay operation is in progress, the supply pumper and operating pump both should remain in ———- position.

However, In standpipe Operations when head pressure needs to be able the supply pump remains in ——- well the operating bumper switches to ———- position.
3.7.2

A

Volume position

Volume position
Operating pumper which is the pressure position

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The ECC of the operating pumper opens the inlet gate and should verify incoming water with the ECC of the supply pumper. The ECC of the operating pumper must also open the ————- , so as to prevent air from the supply hose from entering the pump.
3.7.3

A

air bleeder valves to the inlet being used

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When drifting water, the prime should last for at least?
3.8.3

A

At least 45 seconds
All inlets and outlets not used must be capped and spanner tightened. All gates and drains must be closed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Before pressure can be supplied to a hose line the pump must be engaged. Four steps.
1- place the app as transmission in ?
2- engage the apparatus———-
3- move the ——- to the PUMP position (located in the cab)
4-place the apparatus transmission in ———
4.2.3

A

1-neutral
2-maxi brake
3-pump shift control
(PUMP POSITION)
4- drive

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

T/F
Supplying water to a hoseline from the booster tank should not be delayed by the ECC continuing to hook up to a hydrant after the officer has called for booster water.
4.2.10

17
Q

The engine officer should also be notified when the water level in the booster tank is ——-?
4.2.11

18
Q

When a hose line is to be operated from a standpipe outlet, the ECC must hook up to the stamp system and augmented system. This supply line should be the ——- stretched from the apparatus.
4.3.1

A

First line stretched

19
Q

———- commanders are authorized to approve CIDS and pre-incident guidelines for those buildings that have unique standpipe systems requiring adjustments to the standard FDNY policy.
4.3.2

A

Division commanders

20
Q

Once applying a water to a standpipe system, the ECC uses
3 1/2 inch hose or ——- inch if high pressure pumping.
4.3.3

21
Q

Twist the supply hose how many turns?
Which direction?
4.3.4 B

A

4-5 turns
Left

22
Q

The ECC supplying a stamp pipe system with a pressure of —— psi, plus an additional —- psi for floor of elevation. This is measured to the floor on which the hose line will be operating.
4.3.7

A

105 PSI
5 PSI for floor elevation

Example if the fire is on the 26th floor, the ECC should supply 230 psi to the standpipe system.
105 psi baseline +125 psi to 25 floors of elevation.
PS Remember to subtract 1 floor

23
Q

If the fire department connection is aluminum or has aluminum caps, it indicates a?
4.4.2

A

Non-automatic sprinkler
Or
System perforated pipe 

24
Q

The ECC should supply the sprinkler system with —— PSI.
4.4.3

25
When the first two engine is supplied, both the standpipe and sprinkler systems, both system should be? 4.4.6
Augmented by later arriving units 
26
Large caliber streams are streams that deliver at least —— gallons per minute of water. 4.5.1
350 gallons per minute
27
The blitzfire osculating monitor should only be supplied with —— Hoseline 4.5.2
2 1/2
28
During large caliber stream operations, all valves and gates should be opened ——- to avoid a ———. 4.5.3
Slowly Waterhammer
29
T/F Engine company supplying a LCS should be dedicated exclusively to the task to ensure LCS flow demands are met. 4.5.4
False Whenever possible
30
Supplying a relay operation. The supply ECC should set their pro pressure governor to ——— pressure and informed operating ECC of the pressure that is being sent (this should be roughly —— psi plus Hydrant pressure)
Idle pressure 55 psi
31
Supplying a relay operation. The operating ECC will tell the supply ECC if more pressure is required. This will be done in increments of. —— psi.
10 psi increments Or until the incoming pressure on the supply pumper drops to 15 psi.
32
To prevent the rig from running away from water, the ECC should not allow the intake pressure to drop below —— psi. Once ——- psi intake pressure is reached, the app should be augmented with additional water supply. 5.3.
Drop below 15 psi. Once 15 psi intake pressure is reached.