CHAP5 Engine Company Chauffeur Flashcards
(32 cards)
The first due engine company should strive to enter the block ahead of?
2.3
1st ladder company, and from the same direction
The term in line pumping refers to any situation in which?
2.7.1
3 1/2 inch hose is used to connect to a hydrant.
In line pumping is not exclusive to a situation with a hydrant before the fire building and can be used regardless of the position of the —— or ——.
2.7.2
Hydrant or apparatus
If intake pressure drops below —— psi , the ECC must have their water supply augmented.
2.7.3
Below 15 psi
Later, arriving engine company should attempt to position their apparatus is so the ——- is facing the direction of the operation. 2.8.3.
Backstep
Later arriving engine companies should ensure two ladder companies are on the block before entering ——- streets that could possibly leave ladder apparatus blocked out from the fire building.
2.8.2
Narrow streets 
After the hydrant is properly flushed out, it must be ———- —— for proper pressure.
3.1.2
Flow tested
This is done by opening the hydrant until sufficient water flow under pressure is observed
10 foot soft suction is —— soft suction has 4 1/2 inch couplings and requires accurate positioning close to the hydrant.
3.2.1
3 1/2 soft
35 foot soft connection 5 inch synthetic hose also with 4 1/2 inch couplings. It provides the largest flow of any hydrant connection. But has the potential to ———
3.2.3
Kink
Needs to be properly flaked out
3 1/2 inch hose supply. The rig comes in 50 foot lengths. It allows a great ——- what provides the ——- water flow.
3.2.4
Great flexibility
Least water flow
If the ECC cannot hook up to a positive water source transmit a signal 10-70 via a HT and department radio.
The ——- should be used.
3.6.1
EAB
When a relay operation is in progress, the supply pumper and operating pump both should remain in ———- position.
However, In standpipe Operations when head pressure needs to be able the supply pump remains in ——- well the operating bumper switches to ———- position.
3.7.2
Volume position
Volume position
Operating pumper which is the pressure position
The ECC of the operating pumper opens the inlet gate and should verify incoming water with the ECC of the supply pumper. The ECC of the operating pumper must also open the ————- , so as to prevent air from the supply hose from entering the pump.
3.7.3
air bleeder valves to the inlet being used
When drifting water, the prime should last for at least?
3.8.3
At least 45 seconds
All inlets and outlets not used must be capped and spanner tightened. All gates and drains must be closed.
Before pressure can be supplied to a hose line the pump must be engaged. Four steps.
1- place the app as transmission in ?
2- engage the apparatus———-
3- move the ——- to the PUMP position (located in the cab)
4-place the apparatus transmission in ———
4.2.3
1-neutral
2-maxi brake
3-pump shift control
(PUMP POSITION)
4- drive
T/F
Supplying water to a hoseline from the booster tank should not be delayed by the ECC continuing to hook up to a hydrant after the officer has called for booster water.
4.2.10
True
The engine officer should also be notified when the water level in the booster tank is ——-?
4.2.11
Half empty
When a hose line is to be operated from a standpipe outlet, the ECC must hook up to the stamp system and augmented system. This supply line should be the ——- stretched from the apparatus.
4.3.1
First line stretched
———- commanders are authorized to approve CIDS and pre-incident guidelines for those buildings that have unique standpipe systems requiring adjustments to the standard FDNY policy.
4.3.2
Division commanders
Once applying a water to a standpipe system, the ECC uses
3 1/2 inch hose or ——- inch if high pressure pumping.
4.3.3
3 inch
Twist the supply hose how many turns?
Which direction?
4.3.4 B
4-5 turns
Left
The ECC supplying a stamp pipe system with a pressure of —— psi, plus an additional —- psi for floor of elevation. This is measured to the floor on which the hose line will be operating.
4.3.7
105 PSI
5 PSI for floor elevation
Example if the fire is on the 26th floor, the ECC should supply 230 psi to the standpipe system.
105 psi baseline +125 psi to 25 floors of elevation.
PS Remember to subtract 1 floor
If the fire department connection is aluminum or has aluminum caps, it indicates a?
4.4.2
Non-automatic sprinkler
Or
System perforated pipe 
The ECC should supply the sprinkler system with —— PSI.
4.4.3
150 psi