1
Q

What is the maximum boring percentage allowed in a load-bearing stud if doubled and not successive?

A

40%

2018 NCPC; NCRC P2603.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How often must a 1” diameter Type K copper tubing be supported when run horizontally?

A

Every 6 feet

Table 308.5; NCRC P2605.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How long must air and water tests of vent/drain systems be maintained at constant pressure?

A

15 minutes

312.2; NCRC P2503.5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

1-1/2” PVC installed horizontally in commercial buildings must be supported every:

A

4 feet

Table 308.5; NCRC P2605.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the term for the pipe that receives all discharges inside the building and leads outside?

A

Building drain

Chapter 2, Definition; NCRC – Chapter 2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Piping parallel to a footing must not be installed:

A

Closer than 6” from the footing

307.5; NCRC P2604.4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

A water main is:

A

A public water supply pipe

Definition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Copper tubing 1-1/2”+ must be horizontally supported every:

A

10 feet

Table 308.5; NCRC P2605.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Max horizontal spacing for hangers when installing cast iron pipe in 10’ sections?

A

10 feet

Table 308.5 Note a; NCRC P2605.1 Note a

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

All toilet rooms must have:

A

Both light and ventilation

310.1; NCRC R303

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Minimum height of a urinal partition from the finished floor?

A

5 feet

312.2; NCRC P2503.5.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Minimum test pressure for drainage piping?

A

15 psi

405.3.5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Horizontal support for 3/4” CPVC?

A

Every 3 feet

312.2; NCRC P2503.5.1 (3)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Rigid bracing must be used at changes >45° for pipe 4” and larger?

A

True

308.5; Table P2605.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Minimum depth for exterior water service line?

306.1; NCRC P2605.1 (2)

A

12” or 6” below frost line.
Whichever is greater.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How must buried pipe be supported?

A

Throughout its entire length

305.6; NCRC P2603.2.1

17
Q

Minimum cover on soil pipe leaving a building?

A

3”

Appendix C; NCRC R502.8.1

18
Q

Minimum thickness for protective shield plates?

A

0.0575”

317.2; NCRC R315

19
Q

Max bore in a joist is:

A

1/3 the depth

Appendix C; NCRC R502.8.1

20
Q

When must CO alarms be installed in existing homes?

A

When fuel-fired appliances are replaced

317.2; NCRC R315

21
Q

Max time for absence of temp toilet facilities for crews?

22
Q

Max opening size on drain inlet strainer plates?

23
Q

Which code do you refer to for fire proofing pipe through wall openings?

A

Building Code

307.3; NCRC R302.4.1.2

24
Q

Minimum R-value for pipe insulation in unconditioned areas?

A

R-6.50

305.4; NCRC P2603.5

25
The seal on exterior wall openings for piping must be:
Water tight ## Footnote 305.5; NCRC P2607.2
26
What materials can be used for testing drainage pipe?
Water or Air ## Footnote Section 312; NCRC P2503
27
Head of water required for DWV pipe test?
10’ of head ## Footnote 312.2; NCRC P2503.5.1
28
Vertical support spacing for 1” copper tubing?
Every 10 feet ## Footnote Table 308.5; NCRC Table P2605.1