Cladding And Lagging Flashcards
(27 cards)
What is the primary purpose for cladding and lagging ?
Preotect the insulation beneath it
Which material is used for high temps or fire protection ?
Stainless steel jacketing or sheets
Can cladding materials reduce noise levels ?
Yes , with the use of additional rubber liner
What is the most common material used ?
Aluminum
A good choice of material used to protect against chemical attack would be ?
Stainless steel
Why is a muffle jacket used ?
Has inside rubber liner added to lower sound levels
Name two types of end caps used ?
Crimp type
Lock form type
What do s clips do ?
Support sheeting or piping and maintain set spacing between them
What is used to support the banding between sheets from sliding ?
Tear drops
Banding is only made out of galvanized iron true or false ?
False
Alluminum
Stainless
Expansion springs should have a maximum spacing of _____ feet
50 feet
What is the better choice of fasteners. Rivits or screws ?
Rivits because screws have a tendency to vibrate and loosen over time
Fasteners should be made of the __________ as the material being used
Same material
Thickness of material used is required to meet industry standards ? True or false
True
Provide the lap allowance for pipe ?
Minimum 2” (50mm) for pipe
Provide the lap allowance for equitment ?
Minimum 3” (75mm) for equitment
The prevailing winds will have an effect on the position of the lap seam. True or false
True you want lap positioned away from the winds
Should you seal the cladding ?
Yes
What is the position of a lap seam on pipe ?
On concealed side of the pipe away from prevailing winds
Horizontal pipe 2 o’clock
Vertical piping should overlap one another by at least ______ inches
2”
Can end caps be made in two peices ?
Yes one or two
Which end caps are used on large applications ?
Lock formed type
What is a callout size ?
Inside diameter
Crimp allowance for bevels ?
3/4”