Coach, communicate, Plan electrical test Flashcards

(101 cards)

1
Q

one of the most important aspects you need to remember when dealing with people is

remember their names

always smile

have respect for them

listen when they speak

A

Have Respect for them

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

when planning an oral report, you should make sure it has a/an

joke to start it off

introduction, body and conclusion

key points in the introducion

detailed conclusion

A

Introduction, body and conclusion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

when dealing with a conflict, it is important that you know

there are people who seek conflict out and may want to cause trouble

it is a 2 way process so look at both sides before making a decision

know the person and take the side of who you are friends with

both the 1st and 2nd answers are correct

A

Both 1st and 2nd answers are correct

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

when communicating with people that are from other countries and cultures with little knowledge of english, you should

choose simple words and speak slowly

look for a nod to show understanding

speak loudly so they can understand you

none of the above

A

Choose simple words and speak slowly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

journeyman have the resposibility to____________ for apprenticeship training

aquire coaching skills

coach and mentor apprentices

make entries into the apprentice log books

all the above

A

All of the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

coaches take an active role in helping apprentices learn, improve and contribute to their trade

true

false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

a simplified coachng method includes ___________, tell, show and do

help

plan

describe

demonstrate

A

Plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

effective feedback helps apprentices understand what is expected and what is exceptable

true

false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

corrective feedback

focuses on the problem, not the person

is specific to the problem

is accurate and concise

all the above

A

All of the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

use a ______________ tool to help prepare for a coaching or mentoring training session

power

planning

feedback

none of the above

A

Planning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

when getting a coaching assesment from a peer, have a set of questions you can ask them to see what you did well and what you could do to improve

true

false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

information gathering is an ongoing process that needs to be updated with upgrades or new information on new equipment

true

false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

information gathering for plant equipment will lead to an equipment history file

true

false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

you can gather information for maintenance from

computer web sites

catalogues

equipment manuals

all the above

A

All of the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

when searching for information on the web, you will get to the specific information on the equipment by accessing the manufacture’s web page

true

false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

URL stands for uniform restricted learning

true

false

A

False
Uniform resource Locator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

using e-mail when contacting people, allows them to return an e-mail at their leisure or according to your message

true

false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

cataloges, manuals can be hard copied, on cd’s or located on the web. they are there to help the millwright troubleshoot equipment problems, order parts and install the parts

true

false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

when ordering bearings for equipment, if the OEM does not have the bearing available you could cross-reference the bearing number to another bearing manufacturer

true

false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

belt selection for a drive system is dertermined by

drive type, operating conditions and operating temperature

drive type, operating temperature and HP transmitted

drive type, operating conditions and HP transmitted

none of the above

A

Drive type, operating conditions, HP transmitted

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

when determining the design horsepower, you would not include the overload condition of the drive

true

false

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

design HP = motor HP + service factor

true

false

A

False
Design HP = Motor HP x Service factor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

when designing a belt drive system, you will also need to determine the driven speed, HP per belt and the number of grooves on the sheaves

true

false

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

to find the speed ratio of a chain drive system, you will need to divide the driven speed by the driver speed

true

false

A

False
Driver speed / driven speed = ratio

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
in the chain pitch formula, the P stands for the chain pitch true false
True L= N+n/2+2c/P
24
a prime mover that is classed as a type A is a/an internal combustion engine with a hydraulic coupling electric motor turbine all the above
All of the above
25
condition monitoring and the histroy of the machine will help you predict when a machine may fail and when it needs to be serviced true false
True
26
with CMMS's, a wide range of statistical data and reports can be readily available in seconds true false
True
27
at the middle of the equipment optimized wheel chart (in the managed maintenance systems module) is operations planning true false
False
28
when a CMMS scans equipment for planned maintenance and finds a piece of equipment that will need maintenance, it will create a work order true false
Ture
29
all reports and statistical data for a CMMS are only as good and accurate as the information fed to them true false
True
30
condition monitoring of equipment can include vibration, temperature, pressure and votage sensors true false
True
31
specialized equipment information gathering systems include temperature guns, oil analysis and partical counting true false
True
32
essinger and dodd bars are used to monitor vibrations in equipment true false
False
33
ultrasonic thickness testing can be used to find the thickness of tank walls and product chutes true false
True
34
when estimating for a job, you would include a cost and time estimate true false
True
35
the goal of purcahasing is to receive the right parts, quantities, delievery time and of course the right price true false
True
36
price quotes on a new machine should include a guaranteed purchase price and the weight size delivery time all the above
True
37
a firm quote is one that is time bound is an exact amount spells out all accessories for the machine all the above
All of the above
38
a purchase order is a numbered record that a supplier supplies to the buyer true false
False
39
if the supplier does not have a part in stock it would be recorded as a back order on the packing slip true false
True
40
delivery slips and packing slips tells you what is inside the package and includes a reference to the PO true false
True
41
when sourcing for parts, you only contact one supplier, even though there are many. this is called sole sourcing true false
False
42
some key attributes to a good supplier are reliability, after-sales service, their location and their technical ability true false
True
43
FOB stands for free on board freight on board free on branding both the 1st and 2nd answers are correct
Both 1st and 2nd are correct
44
preventative maintenance involves planned and scheduled disassembly of machines to help reduce downtime. but it also creates problems. one of them is under maintenance over maintenance under inspection production increase
Over maintenance
45
condition base monitoring that monitors equipment constantly, is called__________ maintenance predictive or proactive preventitive uptime breakdown
Predictive or proactive
46
predictive maintenance uses monitoring, measuring and analyzing of the results to predict the wear rate and expected repair schedule of the machinery true false
True
47
breakdown maintenance is always a bad situation as it always costs the company more money in the long run than having preventative maintenance unless you have a second system that you can run while repairing the first true false
True
48
to find the manufactures name, serial number, model, inventory numbers, HP and equipment speeds, you would look them up in the priority system craft requirments equipment records inspection reports
Equipment recorda
49
failure analysis is used to help find the root cause of the failure true false
True
50
CMMS's help set up and build a data base for work orders and safety inventory control asset management all the above
All of the above
51
good planning for scheduled maintenance will help build a well rounded preventative maintenance progam true false
True
52
planning essentials will include the scope, priority, materials, tools and crafts required for the job true false
True
53
one of the problems a planner faces is utilizing their own time true false
True
54
bar charts and arrow diagrams are used to build good work orders for record keeping true false
False
55
there are ____________ kinds of electrical charges 1 2 3 4
2
56
if an object that has the same number of electrons and protons, now gains electrons, it becomes positively charged negatively charged neutralized none of the above
Negatively charged
57
a natural magnet material would be cooper iron petrified wood zirconium
Iron
58
the ease at which a material can be magnetized by a solenoid is a measure of its _________________ hardness softness permeability resistance
Permeability
59
magnetic lines of flux around a bar magnet are strongest at the ends the left side the right side even all the way around
The ends
60
when rotating a conductor material through a magnetic field, the voltage generated is know as_______ EMF MMF SCR IDP
EMF
61
a semi-conductor is neither a good conductor nor a good insulator. (eg - germanium) true false
True
62
a generator generating 60 HZ is rotating at 900 rpm. how may poles would it have. RPM = 120 x HZ/# poles 2 4 8 16
8
63
one HP equals___________watt/s 1 100 746 1146
746
64
the material with the highest conductivity rating is gold silver copper aluminium
Silver
65
a capacitor__________electricity changes the properties of stores eliminates accelerates all the above
Stores
66
the most basic power formula is P = E x I P = I x I x I P = (EXE) x R P = E/R
P = E x I
67
line lugs are cold (de-energized) warm (semi-de-energized) hot (energized) located at the very bottom of the circuit breaker
hot (energized)
68
to open a disconnect switch you would stand to the right of the panel, look away and pull the switch handle located on the right side with your left hand true false
True
69
circuit breakers are designed for severe and sudden overloads short circuit conditions lighter overloads all the above
All if the above
70
water in or near electrical equipment increases the risk of electrocution can cause serious damage to equipment makes many pieces of equipment vulnerable to harm all the above
All of the above
71
circuit breakers have ratings based on voltage current interrupting range voltage all the above
All of the above
72
protect motors that have a high level inrush current during start up have 2 elements are said to be current limiting all answers are correct
All answers are correct
73
HRC fuses are filled with___________ around the fuse link oxygen air foam sand
Sand
74
pot type overload relays require time to cool down before they can be reset require the pot to refill before they can be reset require continuous re-pushing of the start button to reset are indestructible and never fail
Require time to cool down before they can be reset
75
the 4 distinct states of matter are lquid, solid, plasma and gas true false
True
76
one hertz is one cycle per minute 60 cycles per hour 60 cycles per second one cycle per second
One cycle per second
77
the 3 line voltages in 3 phase electicitity are out of phase from each other by ___________ degrees 60 90 100 120
120 degrees
78
voltage in electricity is similar to what characteristics in hydraulics velocity flow pressure restriction
Pressure
79
amperes in electricity is similar to what characteristic in hydraulics acumulator flow pressure restriction
Flow
80
electromotive force of an electromagnet is usually increased by increasing the number of windings increasing the spacing between the windings decreasing the size of the winding wires decreasing the current
Increasing number of windings
81
before working on equipment connected to an electric motor, after you have shut it off and locked it out, you should go ahead and start work push the start button or control power button to see if it will energize the equipment rotate the electrical motor manually all the above
Push the start button or control power button to see if it will energize the equipment
82
a sign for impending electrical problems is discolored wires broken conduit or fittings water on, in or near electrical equipment all the above
All of the above
83
the electrical device that we use to limit the maximum current flow to a safe level during short circuits or heavy overloads, is the disconnect relay toggle switch fuse
Fuse
84
testing a component with an ohmmeter, requires that the power to the component be off on does not matter
Off
85
to check for current in the circuit we would use a ammeter connected in series ammeter connected in parallel voltmeter connected in series voltmeter connected in parallel
Ammeter connected in series
86
to check for high resistance values in a component such as electric motor windings, we would use a oscilloscope volt meter meggar ammeter
Meggar
87
the natural copper wire or sometimes green insulated (in 120-240v wiring) is hot neutral ground for capacitors only
Ground
88
many electrical cords are______________ to protect you from electric shock double insulated partly insulated no insulation all the above
Double insulated
89
a circuit failure in which electrical current flows through a faulty path of very low resistance and causes fuses to blow immediately is called a over current overload short circuit transient voltage
Short Circuit
90
____________________ are used to protect the windings of an electric motor when the current to the electric motor exceeds the calibrated current for the motor thermal overload relays bi-metallic relays melting alloy relays all the above
All of the above
91
a PLC has the advantage of ___________ over relay based control systems lower overall cost programmability reliability all the above
All of the above
92
the chassis of a PLC has a _______________ consisting of the address, data and control busses I/O module processor backplane power supply
backplane
93
the brain of the PLC is the power supply backplane processor modules
Processor
94
ladder logic programs use_____________to communicate in the program that controls the status symbol on a rung I/O cards logic bit instructions processors modules
Logic bit instructions
95
logical AND and logical OR operations are performed by placing instructions in series and in parallel along a rung in the ladder logic true false
True
96
2 types of pressure switches used to measure pressure of fluids in a pressure vessel are hydraulic and bellows pneumatic and hydraulic bellows and diaphragm diaphragm and hydraulic
bellows and diaphragm
97
a photo cell is used for contact sensing non-contact sensing both contact and non-contact none of the above
Non contact sensing
98
single pole control relays can be either single pole single throw or single pole double throw multi-pole single throw or multi-pole double throw double pole single throw or double pole double throw all the above
Single pole, single throw or single pole, double throw
99
2 types of relays can be time delay and fused fused and latching latching and time delay any of the above
Latching and time delay