Industrial Rigging Flashcards

(35 cards)

1
Q

What is the weight of a 36 foot American Standard I-beam designated S15 x 42.9? Use the equation W=w/ft x L

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

If a sling leg is attached to a suspended load at an angle less than 90 degrees, the horizontal force acting on the sling leg

A

Increases as the sling angle gets smaller

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

If both ends of a sling are attached to the hoist hook and a load is suspended from the center of the sling, what hitch is being used?

A

Basket

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Which of the following hooks has a point designated to fit into a hole in the load?

A

Sorting hook

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

If the strands of a wire rope appear to spiral down to the right, and if the wires in the strands appear to be parallel to the rope axis, the wire rope is

A

right regular lay

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A hook should be removed from service if

A

the tip is twisted from the unbent plane

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If a wire rope is classified 6 x 37, the figure 37 means that

A

each strand of the rope contains a nominal 37 wires

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which of these wire-rope end fittings is the most efficient (assuming all are prepared correctly)?

A

speltered socket

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The following factors all affect wire-rope strength. In which is the D/d ratio important?

A

Bending over a curved surface

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If a rigger finds that a wire-rope sling is kinked, he should,

A

remove it from service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which of the following identifications would be most likely to appear on the links of a chain suitable for overhead lifting?

A

800

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The specification for welded-link chain that corresponds to a wire rope’s rated load is called the chain’s

A

working load limit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

If an alloy steel chain sling has been subjected to temperatures over 1000 degrees F

A

it should be removed from service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

There is a slot in one of the standard end fittings for metal mesh slings. It allows the sling to be used in a ____ hitch

A

Choker

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

You should recommend removing a metal mesh sling from service if

A

one welded joint at the edge of the sling is broken

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The strongest and most popular of the synthetic-fiber ropes is

14
Q

To avoid sharp bending and abrasion, the eye of a fiber rope sling should include a

15
Q

A fiber-rope sling should be removed from service if it

A

shows kinking

16
Q

The rated load, or capacity, of an encased polyester sling is indicated by the

A

color of the cover

17
Q

You should remove a synthetic-web sling from service if

A

It is scorched

17
Q

A pocketwheel is part of an

A

overhead manual chain hoist

17
Q

The purpose of an upper limit switch is to

A

keep the load block from rising dangerously high

18
Q

The difference between top-running and underhung cranes lies in

A

How the end trucks of the bridge beams are supported

19
Q

When the rigger lifts a load a few inches, then stops to see if the load drifts downward, what is he checking?

19
Wire rope should be removed from hoist service if the rigger finds
two broken wires at a socketed end fitting
20
In a crane operation involving several people
the operator must respond to a stop signal from anyone
21
You should not use metal-mesh slings
If the spirals do not move freely
22
When working with floor-operated hoists and cranes, you should make sure that
obstructions can be cleared by the moving load
23
One edge of the load serves as a pivot during ____ turning
one-hook
24
When should blocks or other holding devices placed at the location where a load will be set?
before the load is lifted
24
The height of a movable sectional metal scaffold that measures 4x8 ft. at the base should not exceed _____ ft.
16
25
A hydraulic scissors lift of the larger type can safely support ____ workers and their equipment
2
26
Each worker on a suspended scaffold must wear a safety belt connected to a lifeline that is attached to
the structure being worked on
27
When you secure a scaffold with guy wires, what accessories do you use to tighten the wires to the correct tension?
turnbuckles
28
A wooden ladder must NOT be coated with
paint