JJ Flashcards
(269 cards)
WHAT LEVEL EARTHQUAKE DO YOU DO A SITE SURVEY?
Level 2
FOR EARTHQUAKE THE SITE SURVEY IS DONE WITHIN
15 Mins
primary jurisdictional survey shall be conducted code R and completed with in?
30 min
BC shall notify c/c of intensity rating of current location with in?
5 min
Earthquake intensity rating level 0
Nothing Felt
Earthquake intensity rating level 1
EC felt, no damage
Earthquake intensity rating level 2
Window Broken
Earthquake intensity rating level 3
Block walls down
Earthquake intensity rating level 4
Structures shifted off foundation
Earthquake intensity rating level 5
Structural Collapse
Mode __ is the normal dispatch and will be used initially for EC
1
The Disaster Com Plan
a) Mode 1-
b) Mode 2-
c) Mode 3-
d) Mode 4-
a) Normal Dispatch
b) Central Command Single resource
c) District Command, responses prioritized by juris companies
d) Field Command, Bn commander establishes PSAS
Each Battalion functions on its own in which dispatch mode for EC
4
After Secondary Jurisdictional Survey try and contact BN headquarters for ___min before contacting C/C
15 Min
REHAB TIME FOR A GREATER ALARM FIRE?
20 MINS
WHEN DOES A BURN PERIOD END
10 AM
HOW MUCH WATER DOES YOU BODY LOSE IN 1 HR AND 1 DAY
3 qt and 3 ga
CLASS A FOAM FOR OVERHAUL
.2-.4%
Class A foam for Direct Attack
.3-.5%
Class A foam for exposure Protection
1%
*Class A foam 500 Gallons to make 1% how big gallon jug
5 Gallons
Regarding batch mixing of Class “A” foam, 2.5 gallons mixed in a 500-gallon water tank will give a _____ mix
.5%
Class A foam Brush PreTreatment
.7-1%
***Air Leak in excess of 120 PSI per hr you shall
Call mechanic immediately