Jubilee River flood-channel Flashcards
(9 cards)
when was this opened?
2002
What towns does it flow through?
Eton, Windsor, Old windsor, Maidenhead
How long is the channel?
215 miles
Width of the channel?
50 metres
How much did it cost to be built?
£110 million
How much does it cost to repair after each flood?
£680,000
In what year did the Thames face the worst flooding since 1947?
2014
What are the main positives of the scheme?
-protects 3000 homes
-protects 200 businesses
-protects rich towns of Eton and Windsor
What are the main negatives of the scheme?
-Expensive to repair
-Has caused worse flooding downstream in the thames
-Thames now experiences higher discharge
-smaller businesses put under higher risk- insurance cost increased- £500 million in Wraysbury
-Concrete walls are unattractive and damage the environment
-Property prices have increased by 20%
-natural ecosystems harmed due to the build of algae
-Doesn’t protect the less affluent areas of Old Windsor, Wraysbury, Maidenhead