Module 2 Post Questions Flashcards

1
Q

The baseline measurement for determining terminal design

A

Average day peak month

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Multiple airlines located in separate terminal buildings is called this concept

A

Unit terminal DFW, LAX, JFK

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Runway capacity during IFR operations

A

42-53 per hour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Capacity management which is defined as the rate aircraft can go into or out of the airport without regard for delay

A

Throughput capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

On a heliport, this is the load bearing capacity area centered on the final approach and takeoff area.

A

touchdown and lift off (TLOF)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

An airport project that has no potential for environmental impact

A

Unconditional approval

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

This type of condition exists when a normally excluded action may cause significant environmental impact

A

Extraordinary circumstances

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The result of an environmental assessment that may need to take no further action

A

FONSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A business management practice that serves as a strategic plan for addressing environments matters.

A

EMS environmental management system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

This is a strategy for reducing the carbon footprint of an airport

A

Sustainability or sustainable design

Sustainable development (go green):
A management strategy
A proactive approach to environmental management
A management philosophy
Can help reduce the airport’s environmental footprint.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Being on a list of violating facilities means the airport is ineligible of receive

A

Federal funds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

A small generator generates more than 100 kg of hazardous waste but less than this amount

A

1000 kg

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The superfund reauthorization act requires airports to develop these types of plans to address fuel spills

A

Emergency response plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

This type of capacity measurement is always less than throughput capacity

A

Practical capacity..or PHOCAP

Throughput-rate aircraft operate without read for delay

PHOCAP-total combined capacity measure of the runway, taxiway, and gate access.

PANCAP-practical annual capacity-level of operation that results in not more than 4 minutes average delay per aircraft in a normal peak two hour period.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

This is used by air traffic control to calculate the desired arrival between successive arrival aircraft

A

Aircraft acceptance rate

AAR-used by ATC, agreed upon number of aircraft that can land at a given airport in a one-hour period.
Delays will increase exponentially beyond 4-6 minutes of delay. 9+ minutes=severely congested.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When performing a capacity analysis, these areas are included: airspace, airfield, terminal, and

17
Q

Cost bearing fee is this type of pricing

A

Differential pricing ( single aircraft versus twins, etc.)

18
Q

FAA part 36 addresses noise coming from this source

A

Aircraft engines

19
Q

The Aircraft Noise Capacity Act of 1990 placed a limit on these types of engines

A

stage 2 (being phased out)

20
Q

The standard airport noise prediction mode

A

INM-integrated noise model

21
Q

Intermodal in this factor are critical to developing an effective metropolitan system plan

A

Public Input

22
Q

This type of planning includes airports within a region

A

Metropolitan Planning MASP (Metropolitan Airport System Planning)

23
Q

This plan is the long-term strategy of for the development of airport facilities

A

Master plan

24
Q

phase 1 of the master plan update focuses on this process

A

Consultant selection

Governed by the Brooks At which requires the selection to be based on qualifications, and award to be made according to a fair and open selection process.

25
This type of forecast modifier takes into account local conditions such as a new business that just located next to the airport
smoothing ``` There are 4 modifiers: Smoothing Regressions analysis Trend analysis .??? ```
26
Construction qualification for and airport master plan study is based on this qualification
Brooks Act (best qualified)
27
If there will be a significant environmental concern with an airport master plan, this entity should be consulted
FAA
28
Noise contours can be found on this document within the ALP
Land use map
29
This ALP document commonly referred to as Exhibit A
Property Map
30
Property owned by the airport that is not available for aeronautical use and often separated from the airport is called
Out parcels
31
After consultant has been selected, public involvement and environmental have been addressed, the next step is
Inventory
32
Long term round trips are a characteristic of this type of airport
International