Q

Which of the following are purposes of Major Capability Acquisition pathway?

A

Develop Technology; produce weapons system; provide logistics support

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Documents produced by the Joint Capabilities. Integration and Development System (JCIDS) process are used to support the Major Capability Acquisition pathway milestone decisions

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which of the following are characteristics of the Materiel Solution Analysis (MSA) phase?

A

Promising technologies are analyzed to determine which one is best suited to meet validated requirements

A Program Manager (PM} is selected and a program office is established

The Analysis of Alterative (AoA) is conducted

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The results of the Analysis of Alternative (AoA) provide the basis for which of the following?

A

Acquisition Strategy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A successful Milestone A decision leads to entry into which phase?

A

Technology Maturation and Risk Reduction (TMRR)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The Milestone Decision Authority (MDA) must approve which of the following for a program to successfully complete Milestone A?

A

The proposed materiel solution

The Acquisition Strategy

A Product Support Strategy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When does a program enter the TMRR phase?

A

When the Analysis of Alternatives (AoA) has been completed and the MDA has approved the AS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Which of the following are goals of the Technology Maturation and Risk Reduction (TMRR) phase?

A

Reduce technology risk

Demonstrate critical technologies through prototyping

Conduct a Preliminary Design Review (PDR)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

One of the requirements for a project to exit the Technology Maturation and Risk Reduction
(TMRIR) phase is that the technology has been demonstrated in a relevant environment

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the purpose of Milestone B?

A

Initiates Engineering and Manufacturing Development phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Which of the following are key considerations of the Engineering and Manufacturing Development (EMD) phase?

A

Completes all needed hardware and software detailed design

Systematically retires any open risks

Prepares for production and deployment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which of the following is a responsibility of the PM during the Engineering and Manufacturing
Development (EMD) phase?

A

Finalizing designs of the product support elements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which of the following are considerations for Milestone C?’

A

Cost estimates

Environmental issues

Manpower estimates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Milestone Decision Authority (MDA) decisions made during the Production and Deployment phase are documented where?

A

Acquisition Decision Memorandum (ADM)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Which of the following are key considerations of low Rate Initial Production (LRIP)?

A

Establishes an initial production base for the system

Provides Initial Operational Test and Evaluation (IOT&E) test articles

Provides an efficient ramp-up to Full Rate Production (FRP)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Acquisition programs enter into Full Rate Production and Deployment after completing the Product Support Strategy

17
Q

The Operations and Support phase is based on what?·

A

An MDA approved Product Support Strategy (PSS)

18
Q

PM’s are encouraged but not required to establish organic depot maintenance capabilities

19
Q

Which of the following are Program Manager (PM) considerations during the Disposal work effort?

A

Complete reuse or recycling of system components and materials

Sale or donation to the private sector or other governments

Wasted disposal

20
Q

Which one of the following is considered a primary goal of an Acquisition Strategy?

A

Minimize the time and cost needed to satisfy validated needs

21
Q

The AS must be approved by the Milestone Decision Authority (MDA) prior to what?

A

Release of a formal solicitation

22
Q

Which item is defined as the minimum acceptable value for performance that is necessary to
satisfy an identified need?

23
Q

Which of the following are considered parameters of the Acquisition Program Baseline (APB)?

A

Cost

Schedule

Performance

24
Q

Milestone A

A

initiates Technology Maturation and Risk Reduction

25
Milestone B
initiates Engineering and Manufacturing Development
26
Milestone C
initiates Production and Deployment
27
What are the 5 phases of the Major Capability Acquisition (MCA) Pathway
Materiel Solution Analysis (MSA) Technology Maturation & Risk Reduction (TMRR) Engineering & Manufacturing Development (EMD) Production & Deployment (P&D) Operations & Support (O&D)
28
Four Decision points of MCA pathway
1. Materiel Development Decision (MDD) 2. Capability Development Document Validation (CDD-V) 3. Development Request for Proposal (RFP) Release Decision 4. Full-Rate Production (FRP) Decision)
29
Milestone B authorizes entry into?
Engineering and Manufacturing Development (EMD) phase
30
When can EMD phase end
Design is stable System meets validated capability requirements Manufacturing processes are under control Industrial production capabilities are available System has met or exceeds all directed EMD Phase exit criteria
31
The Deployment Phase of DAS begins at which milestone?
Milestone C
32
Purpose of Milestone C is?
To authorize entry into: Low-Rate Initial Production (LRIP) for MDAPs and Major Systems Production or procurement (for systems that do not require low-rate production) Limited deployment for Major Automated Information Systems (MAIS) or software-intensive systems with no production components