MR (Materials And Resources) Advanced 1 Flashcards
(41 cards)
How many prerequisites are there for MR and what are they?
2 prerequisites
P1 Storage and Collection of Recyclables
P2 Construction and Demolition Waste Management Planning
How many credits for MR are there and what are they?
5 credits
C1 Building Life Cycle Impact Reduction
C2 Building Product Disclosure and Optimization- Environmental Product Declaration
C3 Building Product Disclosure and Optimization- Sourcing of Raw Materials
C4 Building Product Disclosure and Optimization- Material Ingredients
C5 Construction and Demolition Waste Management
What are the minimum requirements for MR P1, Storage and Collection of Recyclables?
Recycle all 5 of the following:
- paper
- glass
- corrugated cardboard
- plastic
- metal
Plus 2 of the following:
- batteries
- mercury lamps
- electronics
For retail projects what is required in order to meet MR P1, Storage and Collection of Recyclables?
Conduct waste stream audit to identify the top 5 material types over a 24-hour period and choose 4 to provide recycling for
For MR P1, Storage and Collection of Recyclables, what 2 hazardous waste must be collected, stored, and properly disposed of?
Two of these 3:
- Batteries
- Mercury Containing Lamps
- Electronic Waste (office equipment such as computers, tvs, and appliances)
What documentation for MR P1 Storage and Collection of Recyclables is specific to Retail?
Waste stream study/audit to identify top 5 recyclable waste streams
To implement MR P1, Storage and Collection of Recyclables, what simple implementation efforts are required
Signage and convenience.
To earn points for MR P2, Construction and Demolition- Waste Management Planning, what is required?
A simple plan that includes:
- Establish waste diversion goals for the project by identifying at least 5 materials targeted for diversion; and
- Specify whether materials will be separated or commingled
Define WASTE STREAM AUDIT
Process conducted over a 24-hr period that identifies the top 5 recyclable waste streams.
What analysis will the project team conduct for a whole building life cycle assessment?
Cradle-to-grave to compare a design case building to a baseline building
Extended producer responsibility…2
Ceiling tile recycling….
If a building loses its historic designation as a result of extensive renovations due to code requirements, what MR credit can the team apply for?
MR Building and Material Reuse Option 3
What is the difference between cradle-to-cradle vs cradle-to-grave vs cradle-to-gate and when would they be used?
Cradle-to-grave= buildings Cradle-to-cradle= materials Cradle-to-gate= ???
Waste-to-energy…
A
What are the 4 options for MR C1, Building Life Cycle Impact Reduction?
Option 1, Historic Building (5 points)
Option 2, Renovation of Blighted Building (5 points)
Option 3, Building and Material Reuse (2-4 points)
Option 4, Whole Building Life Cycle Assessment (3 points)
What are the 6 impact categories for measuring reduction in MR C1, Building Life Cycle Impact Reduction Option 4 and which is required?
- Global Warming Potential (required)
- Ozone Depletion
- Acidification of Land and Water
- Eutrophication of Water
- Formation of Tropospheric Ozone
- Depletion of Nonrenewable Energy Resources
What is required to meet MR C1, Building Life Cycle Impact Reduction Option 4?
10% reduction in 3 impact categories, one being Global Warming Potential WITHOUT increasing any impact category by 5%.
How is the cost of a material calculated as it relates to material reuse specific to MR C3, Building Product Disclosure and Optimization- Sourcing of Raw Materials?
Actual price of material + taxes and delivery
- exclude equipment and installation/labor
- include any discounts or rebates
Relocated furniture and furnishings can contribute towards MR C3 Sourcing of Raw Materials Option 2 if they were purchased when?
At least 2 years prior to the date of project registration
To earn points for MR C5, Construction and Demolition Waste Management Option 1 Diversion, what are the requirements?
Path 1 requires 50% diversion of 3 material streams
Path 2 requires 75% diversion of 4 material streams
To earn points for MR C5, Construction and Demolition Waste Management Option 2 Diversion, what are the requirements?
Generate no more than 2.5 pounds of construction waste per square foot of building floor area
What is excluded from diversion calculations?
Soil, land-clearing debris, and alternative daily cover
Which materials are included in a whole building life cycle assessment?
Includes complete building envelope and structural elements
- footings
- foundations
- structural walls
- interior wall cladding
- structural floors
- ceilings
- structured parking
(exclude interior finishes, non-structural walls, furniture, and MEP)
When using the LCA tool to compare a baseline building to a proposed building what parameters must be the same?
- LCA scope
- size/gsf
- function
- orientation
- location/climate zone
- operating energy efficiency