MSTE Flashcards
(11 cards)
It is nothing more than a column driven into the soil to support a structure by transferring building loads to a deeper and stronger layers of soil or rock.
Pile
If it is considered to be the basic unit of
travel behavior. It is also involve movement from single origin to a single destination and are usually described in terms of their origins, destinations, purposes, time of occurrence, travel modes and routes.
Trip
It is the timing of signals in relationship to one another so that vehicles traveling at a determined speed can pass through the greens of successive signals.
Signal coordination
is the type of thermoplastic lane marking designed to aid and provide motorist with visual, audio and motion warning on the road.
Rumble strip
It represents the component of vehicle weight which acts parallel to an inclined surface.
Grade resistance
These are circumstances or deviation from standard condition which could permit occurrence of accident pr incident is called
Hazard
These are circumstances or deviation from standard condition which could permit occurrence of accident pr incident is called
Hazard
On what days of the week can the first day of century fall? The first day of the 20th century was Ján. 1, 1901.
Monday
Which of the following is the correct step by step process of finishing standard weight concrete slabs in chronological order?
I. Bleeding
II. Screeding
III. Leveling
IV. Edging
V. Jointing
VI. Floating
VII. Troweling
VIII. Broom finishing
The elements to consider when planning
National Roads.
- Limited frontage access
- Development set well back from the highway
- All access to premises provided via provincial roads
- Number of intersections to be minimized
- Suitable at grade-channelized intersections for minor flows and other elements
- No roadside vendors
Which of the following are the fundamental principles that should be observed in the application of upper retarders?
The retarder should be as near as
possible to the warm side of the
insulation or warm face of assembly and the retarder should be installed by a method suitable for the specific condensation hazard.