Normal Procedures Flashcards

1
Q

Wat moeten we doen voor de vlucht? (9)

A

Weather, notams, fuel, weight & balance, performance, flight log and flight plan, personal documents, FRAT and IMSAFE, aircraft technical status, aircraft documents, aircraft equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Wat is de cockpit preparation flow? (4 fases)

A

FASE 1: seats, seat belts empty seats, lock canopy, check flight controls

FASE 2: hobbs meter, set parking brake on, set fuel selector on, set power lever idle, check ALT CB.

FASE 3: battery on, check CED auto test, verify: alternator on, engine master off, fadec switch auto, avionics off, starter key ready off, alternate air pushed in, flaps retracted, all CB’s in, pitot heat off, lights off, elt armed, trim, magnetic compass, test lights, alternate static source off, flights instruments normal, clock, traffic on

FASE 4: avionics on, check atis, request atc, avionics off

BEFORE START CHECKLIST

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Wat is de engine start flow? (3fases)

A

FASE 1: hold brakes, strobe on, fuel pump on, clear prop area “PROP CLEAR”

FASE 2: engine master on, verify fadec lights, wait till glow off, start with key,

FASE 3: check oil pressure >1bar, cancel CED, verify no lights, quad gauge normal, fuel pump off

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Wat is de reposition after start flow? (2fases)

A

FASE 1: obtain taxi clearance, taxi light on, nav light on, area free, parking brake off, perform brake check both sides

FASE 2: set parking brake, nav light off, taxi light off, perform BEFORE TAXI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Wat is de before taxi flow? (2 fases)

A

FASE 1: alternator off, battery off, wait 10 seconds, battery on, alternator on

FASE 2: avionics on, check G5, IFRB (initialize, flightplan, radio, bugs), perform briefing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Wat is de taxi flow? (1 fase)

A

FASE 1: engine idle for 2min, taxi light on, navigation light on, “LEFT IS FREE, RIGHT IS CLEAR”, parking brake off, brake check both sides, check flight instruments in turn “TURNING LEFT, SKIDDING RIGHT, HSI AND COMPASS DECREASING, HORIZONS LEVEL”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Wat is de before take off flow? (2 fases)

A

FASE 1: parking brake on, fuel selector on, power idle, perform fadec test

FASE 2: check CED, fuel pump on, flaps T/O, CBs in, set trim, check stick movement, canopy closed, short briefing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Wat is de line up flow? (2 fases)

A

FASE 1: “LINE UP ITEMS”, parking brake off, verify approach “APPROACH FREE”

FASE 2: landing light on, taxi light off, transponder ALT, pitot on, “THRESHOLD ELEVATION … FEET”, “RUNWAY HEADING … DEGREES”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Wat is de take off flow? (2 fases)

A

FASE 1: top the timer, “TAKE OFF, I HAVE CONTROL”, hold brakes, full power, check oilpresssure, RPM 2240-2300 RPM, 94% “POWER CHECKED”, release brakes

FASE 2: increasing speed “SPEED CHECKED”, rotate at 60 kts “60 KNOTS, ROTATE”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Wat is de after take off flow? (2 fases)

A

FASE 1: climb at 10°, 70 kts, at 400 kts: lower nose to 7°, speed 80 kts, at 75 kts “FLAPS UP”

FASE 2: landing light off, fuel pump off, check transponder

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Wat is de climb flow? (1fase +cruise elke 15)

A

FASE 1: at 1000ft, speed 85kts, at T.A. set QNH 1013 “TRANSATION ALTITUDE, SET STANDARD”

FASE 2 (elke 15minuten): check fuel status and temp, monitor CED, check annunciations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Wat is de descent and approach flow?(2 fases)

A

FASE 1: at transition level set qnh “TRANSATION LEVEL, SET QNH …”

FASE 2: check CED, landing light on, fuel pump on, check altimeter qnh, check annunciations, perform briefing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Wat is de landing flow ? (1 fase)

A

FASE 1: check brakes, set flaps T/O at 85 (set speed 80 kts) and flaps LDG at 75 kts (set speed 70kts)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Wat is de go around flow? (2 fases)

A

FASE 1: “GO-AROUND, FULL POWER, FLAPS T/O”, power full, 10° pitch, flaps T/O

FASE 2: at 400ft, flaps up, “FLAPS UP” 80kts climb, landing light off, fuel pump off

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Wat is de after landing flow? (1 fase)

A

FASE 1: landing light off, taxi light on, fuel pump off, flap retracted, transponder STBY, pitot heats off, start timer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Wat is de shut down flow? (1fase)

A

FASE 1: perform checklist items, write down hobbs meter