Operational Method Statements OMS Flashcards

(12 cards)

1
Q

OMS001-Incident Management;
Who is responsible for establishing an Incident Control Point?

A

The OIC of the first arriving appliance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

OMS001-Incident Management;
What are 5 considerations when establishing and Incident Control Point (ICP)?

A

1) ease of access

2) prominence of location with a good overview of the incident

3) ability to stage and deploy all arriving appliances and support agency personnel

4) safety from any incident hazards

5) potential impediments to incident communications.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

OMS001-Incident Management;
Does Commander and above need to assume control?

A

No, however once they are onscene they are responsible for the incident.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

OMS001-Incident Management;
When implementing an IMS, what 5 AIIMS principles should be applied?

A

1) management by objectives
2) functional management
3) span of control
4) flexibility
5) unity of command

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

OMS001-Incident Management;
Must all people performing functional roles wear a tabard?

A

Yes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

OMS003-Incident Sectors;
What are 3 instances where an incident will need to be sectorised?

A

1) operations are taking place in more than one location, or remotely from the Incident
Control Point.

2) the span of control on the fireground exceeds 1:5.

3) technical operations are taking place.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

OMS003-Incident Sectors;
Who has the authority to create sectors at an incident?

A

Ensure the creation and location of incident sectors is only established under instruction
from the Incident Controller.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

OMS003-Incident Sectors;
What is the minimum rank that can be used as a sector commander?

A

Leading Firefighter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

OMS003-Incident Sectors;
What is the minimum rank that should be used to fill sector commander roles at 3rd Alarm and above incidents?

A

Utilise a Station Officer or Senior Station Officer for all 3rd alarm incidents and above.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

OMS003-Incident Sectors;
List 3 things that a Sector Commander should do or ensure is done?

A

1) Wear a tabard and be identifiable
2) Ensure that a SMEACQS briefing is obtained from Incident Controller
3) Continue to apply SPADRA and monitor crrew safety

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

OMS003-Incident Sectors;
How many sectors are there for a for a low rise structure (up to 4 levels) and how are they determined?

A

4 sectors starting with sector 1 at the front and moving in clockwise direction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly