Power & Distribution Flashcards
how many diesel generators are fitted to a distribution system
four
what does EDC stand for
Electrical distribution centre
how many EDC’s are fitted to a distribution system
four
What does MCCB stand for
moulded case circuit breaker
list the 5 main breakers fitted to a distribution system
- supply breaker
- shore/supply breaker
- busbar linking breaker
- interconnector
- feeder breaker
what is the power book
shows the distribution for all 440v services
what is the lighting book
- includes low power
- shows postcode / layout for lighting circuits
- 115v/230v
what is the reference books
books provide images and information covering the ships systems and equipment fitted
what is the ratio for 440v fuses
(fuse discrimination)
3:1
what is the ratio for 115v fuses
(fuse discrimination)
2:1
explain breaker discrimination
- First breaker to trip is the MCCB
- Last breaker to trip is the supply breaker (otherwise all power will go out)
- Breaker nearest the fault is the first to trip
- Breaker furthest from the fault is the last to trip
(kettle wont trip a generator)
what does MCR stand for
machinery control room
What does PCP stand for
primary control position
What does SCP stand for
secondary control positions
what are the three basic items that a distribution system needs
prime mover
generator
switchboard
list the meters fitted to a switchboard generator section
6 in total
- voltmeter
- ammeter
- kw meter
- frequency meter
- syncroscope
- earth meter
where are breaker operating switches found and what are they called
- dicrepency switch
- located in pcp
describe the connection of shore supply
what are the rules regarding eathing the ship when connecting shore supply
- ship must be earthed to either the jetty or ship along side
- by at least 2 points, not less then half the ships length
- ganway needs to be earthed
what is used to confirm correct phase rotation
- the phase sequence indicator (2 lamps)
- the right one should be brighter
what would happen to a motor if phase rotation is wrong
motors would run backwards
list 3 types of hand changeover switches
- normal/alternative
- normal/emergancy
- normal/alternative/emergancy
list 3 kinds of changeover switches
- ACOS
- HCOS
- ROCOS
what & where are the 440v earth testing facilities found
- earth indicator light located on the switchboard
- some also have audible alarms