(SPACE REQS) Capacity of the processing plant shall be calculated based on the volume of commodity being processed. An area of __________ of commodity shall be provided.
20 square meter per ton
(SPACE REQS) The storage area of a processing plant shall have a capacity for temporary storage of raw materials for ________ processing days.
2-5
Ceilings shall be at least _______ from the finished floor line.
2.4 m
All wall tops and ledges shall slope at _______.
.
45 DEGREE
(WALL) It shall be coved to the floor-wall and at wall-to-wall junctions with a minimum radius of ____________.
50 mm - 60 mm
(WINDOWS) All windows shall be properly installed with _______.
16-mesh screen
(WINDOWS) Window ledges shall be sloped about ________
to prevent the accumulation of dirt, water, or debris.
45 DEGREE
Windowsill shall be at least _______ from the finish floor line.
1 m
Doors shall have a minimum width of _______.
1.5 m
(FLOOR) Intersection with the wall shall be coved with ______.
50 mm - 60 mm radius
The floor shall slope _______ towards the drainage.
2% - 4%
The height of sorting and grading surface shall be about _______ below the bottom of the elbow in the normal working position (sitting or standing)
100 mm - 150 mm
(STOREROOM FOR FINISHED PRODUCTS) The area shall be clean, the temperature and humidity levels shall be appropriate (less than _______ of relative humidity), and it shall be protected from foreign matter.
25 C° and 60%
(LIGHTING) Outside the building
100 lux
(LIGHTING) General
200 lux
(LIGHTING) Working table
500 lux