Project Manual & Spec Flashcards
Project manual includes
- Cover sheet
- TOC
- bidding requirements
- invitation to bid
- prequalification forms
- instruction to bidders
- information available to bidders
- bid forms
- supplements to bid forms
- bid security form
- subcontractor list
- substitution list
- contract forms
- agreement (contract between owner and contractor)
- performance bond
- labor and materials payment bond
- certificates of insurance
- general (A201) and supplementary conditions
- technical specifications
3 sections of spec
- general 2. products 3. execution
Master Spec - Division 01
General Requirements
Master Spec - Division 02
Existing Conditions
Master Spec - Division 03
Concrete
Master Spec - Division 04
Masonry
Master Spec - Division 05
Metals
Master Spec - Division 06
Wood, Plastics, Composites. Covers structural wood framing, rough carpentry, finish carpentry, custom casework.
Master Spec - Division 07
Thermal and Moisture Protection
Master Spec - Division 08
Openings. Doors & windows including metal and wood door / window frames. Specialty doors, storefronts, skylights, curtain walls, glazing and hardware.
Master Spec - Division 09
Finishes. Covers plaster, gypsum wall (including metal framing), flooring, floor and wall tiles, terrazo, ceilings and acoustical treatments, paints and coatings.
Master Spec - Division 10
Specialties. Includes visual display boards, toilet compartments, louvers, grilles, wall and corner guards, access flooring, lockers, awnings, demountable partitions, storage shelving, exterior protections like sun screens and storm panels, and toilet and bath accessories.
Master Spec - Division 11
Equipment
Master Spec - Division 12
Furnishings. Includes furniture, window treatments, manufactured casework.
Master Spec - Division 13
Special Construction
Master Spec - Division 14
Conveying Equipment
Master Spec - Division 21
Fire Suppression
Master Spec - Division 22
Plumbing
Master Spec - Division 23
Heating, Ventilating, and Air Conditioning (HVAC)
Master Spec - Division 25
Integrated Automation. Including energy monitoring and control, environmental control, lighting control and similar topics.
Master Spec - Division 26
Electrical
proprietary spec (closed base bid)
The most restrictive. Product/materials/systems are specifically called out and there’s no substitutions allowed. Easy to write, short.
prescriptive spec with alternates
A base bid with a list of at least 3 approved manufacturers or “approved equal”
performance spec
specifies the results the final construction assembly must achieve. Does not mention trade names. It gives the contractor and suppliers more scope to innovate and adopt cost effective methods of work, potentially offering better value for money. Contractors can comparatively bid.