Quantification and Costing of Construction Works Flashcards

1
Q

Why were the New Rules of Measurement introduced?
The names of the NRM documents?

A

BiLaCo

NRM 1: Order of cost estimating and cost planning for capital building works

NRM 2: Detailed measurement for building works

NRM 3: Order of cost estimating and cost planning for building maintenance works.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The structure of NRM1?

A

IntMeMeTaApp

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Why use the NRM?

A

ComPra

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the NRM1?

A

Order of Cost Estimating and Cost Planning

A structured basis for measuring building works for Cost Estimates and Cost Plans

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is GEA?

A

GROSS External Area

Measured to external face at each floor level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is GIA?

A

GROSS Internal Area

Measured to internal face at each floor level.

Excludes:
Open sided balconies
Fire escapes
Canopies
Fuel Stores

[anything which is not fully ‘enveloped’?]

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is NIA?

A

NET Internal Area

Usable space measured to internal face at each floor level.

Excludes:
Internal STRUCTURAL walls
Internal columns
Areas with headroom less than 1.5m
Lift lobbies
Toilets
Cleaner’s cupboards
Plant rooms

[any area which cannot be ‘Let’ or form part of building management?]

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Where are the above terms defined?

A

RICS’s Code of Measuring Practice, for the purpose of precise definition for accurate and consistent measurement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

% of NIA to GIA?

A

Depends on building type.
Office 70-85% (inefficient to very efficient)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What do you measure in accordance with?

A

Depends on:
The region
Project
Client
Industrial Sector eg NRM/CESMM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How do you measure Steelwork, NRM2?
Other items associated to measure?

A

Tonnes
Itemised - length; weight; type
Eg column; ne 25kg/m; ne 1.00m

ErFoRaS.MFiPrTrCo

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How do you measure brick walls, NRM2?

A

Section 14
M2
Thickness, type, method
eg
Common brickwork in cement:lime mortar (1:1:6); wall 215 thick; brickwork

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What do you measure in association with brickwork, NRM2?

A

C.SArBrCaCa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How do you measure steelwork, NRM2?

A

Section 15
Tonnes
Length, weight, type
eg
column; ne 25kg; ne 1.00m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the purpose of a BoQ?

A

Tendering
To provide the Estimator:

AccAnVaPa

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How do you prepare before doing a BoQ?

A

WhComSuffMeBrTakGenRev

17
Q

How do you structure a BoQ?

A

The below is not complete?!

Elemental breakdown of NRM2:
PF
SSI[cost plan]
Ffe
SE[cost plan]
PD

18
Q

How would you describe Preliminaries?

A

Items of work required but do not form part of the measured works.

19
Q

Information required to measure Preliminaries?

A

DLTSTSMPSADSI

what are the sections of Preliminaries document??

20
Q

What includes, BoQ, works by Nominated Subcontractor?

A

Prime Cost Sum:
Quote for the work
Attendance
OHP

21
Q

What is a PSUM?

A

Allowance in the BoQ where extent and design not yet known and cost cannot be established

22
Q

What is a Defined PSUM?

A

Works with sufficient information to allow for pricing of preliminaries

23
Q

What is an Undefined PSUM?

A

Works with insufficient information to allow for pricing preliminaries - entitling EoT and preliminaries [and L&E?]

24
Q

How do you audit a Cost Reimbursable Contract?

A

ForRevRecChAdj

25
What is Simpson's Rule?
Don’t think below is right: Formula to calculate approximate area under a curve over a given interval
26
How do you check items for a BoQ are accurate?
Peer reviews: All scope captured Spot checks on quantities
27
What items are included in a BoQ for a basement?
If piled wall and a clear site: ExPilExPrepWBCRFFI
28
How is something unique measured eg a statue?
PSUM with detailed descriptions of the works
29
How do you deal with groundwater, NRM2?
Section 5: Item Original level stated and whether polluted Post contract level stated and measured Method of discharge up to contractor
30
What is a Preamble?
ExInterParBackMeas
31
What are Method Related Charges?
One Off not forming part of the works and not proportional to the associated works to be carried out eg propping of elevation
32
What are Time Related Charges?
Method related charges which are proportional to the time taken to carry out the associated works eg plant hire
33
What are Fixed Charges?
Method related charges that do not vary with time eg service connection charges