Questions Flashcards
What does Dry Fit mean?
Assembling the piping system without glue to check alignment and fit before final inspection
How long should you hold a pipe and fitting together after applying cement?
At Least 30 seconds to ensure strong bond and prevent push out
Before applying solvent cement, what must ve done to the pipe and fitting?
Clean them with primer to remove dirt and soften the plastic for bonding
What is the main difference between PVC and CPVS?
CPVC can handle higher temperatures and is used for hot water lines, while PVC is typically used for cold water lines
What are the most two common type of plastic tubing used in new construction plumbing?
PVC (Polyvinyl Chloride) and CPVC (Chlorinated Polyvinyl Chloride)