Q

What does Dry Fit mean?

A

Assembling the piping system without glue to check alignment and fit before final inspection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How long should you hold a pipe and fitting together after applying cement?

A

At Least 30 seconds to ensure strong bond and prevent push out

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Before applying solvent cement, what must ve done to the pipe and fitting?

A

Clean them with primer to remove dirt and soften the plastic for bonding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the main difference between PVC and CPVS?

A

CPVC can handle higher temperatures and is used for hot water lines, while PVC is typically used for cold water lines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the most two common type of plastic tubing used in new construction plumbing?

A

PVC (Polyvinyl Chloride) and CPVC (Chlorinated Polyvinyl Chloride)