Rule Week 1 Flashcards
What does the STAR process stand for?
When is this accorynm indented for?
Stop, Think, Assess, Release
Door release, but can be used during all processes.
Communication
What does ABC-P stand for?
Accurate, Brief, Clear & Professional
What is Permissive working?
A method of signalling a train movement into a section of line that is occupied by another train or rail vehicle.
Or
Permissive working allows a second train to be signalled onto a running line that is already occupied so that more than one train at a time can be on the same line in a -
Block section
Signal section
Dead-end platform line.
Permissive working
What max speed is used at the platform ramp during permissive working?
What distances must you stop short of a static unit? Initially and then to check the coupling is lined up?
10 mph
6.6 ft then 2 feet
What does DRA stand for and when does it need to be used?
Driver reminder appliance.
When you enter or leave the cab.
Before starting a journey
When taking over from another driver.
When you come to a stand at a stop signal when the starting signal is at danger, or, you have entered the platform on a single yellow/distant signal at caution and the next signal is out of sight.
When stopped at a stop board.
What is a splitting distant signal?
How would you interpret this signal?
Splitting distance signals are used to tell the driver which way the train is to be signalled at a junction where there is one diverging route.
You would always follow the least restrictive aspect
Detention of Absolute Block
Only one train should be allowed in any one block section at one time
What is the Block section, in semaphore signalling?
A block section is a section of line, stretching from the last stop signal(section signal) controlled by one signal box to the first stop signal (home) controlled by the next signal box.
How do you get on and off a rail vehicle?
3 points of contact.
Getting in - bag in first
Getting out - bag out last before shutting door.
What does distant ON indicate? (Semaphore)
At caution. expect all associated Stop signals to be at danger.
Define the purpose of flashing yellow aspects?
A flashing yellow aspect means facing points at a junction ahead are set for a diverging route with a lower speed than that for the straight route
Buzzer code
What is 1
Stop
Buzzer code
What is 2?
Ready to start
Buzzer code
What is 2-2?
Do not open doors
Buzzer codes
What is 3-2-1?
Testing doors
Buzzer codes
What is 3-3?
Driver required by guard
What is the emergency call procedure?
State - THIS IS AN EMERGENCY CALL.
Are you speaking to the correct person?
Your name/job/employer (headcode)
Where are you speaking from.
Where is the emergency. Give details of incident location.
Give details of the incident
Lines that are blocked
Ask for emergency switch off if required
Ask for required actions
Inform if emergency services are required
Ask to be repeated back
Buzzer code
What is 3-3-1?
Open doors
What does a dangerous goods label contain?
UN Number
Pictogram(with hazardous item)
Telephone number
How do you start a rail dangerous goods emergency call?
This is a rail dangerous goods call
What can be considered a danger to trains?
A door not closed properly.
An insecure load.
A vehicle on fire.
A hot axle box.
A headlight not lit.
A tail lamp missing or not lit.
The driver sounding the horn in distress
The driver or guard displaying a red hand signal.
The hazard warning indicator(flashing headlights)
How would you stay safe during a dangerous goods emergency?
Stay well clear.
Keep the wind behind you.
Avoid low-lying places.
Keep unauthorised personnel well clear.
Try to put out fire, If no risk.
Keep naked lights and lamps well clear.
Do not smoke,use matches or lighters
Do not use mobile phones near flammable loads.
What can pose a danger to an approaching train?
A track defect
Flood water
An obstruction
A fire
Any light out of an emergency indicator
A large animal within the boundary fence.
Any other animals on or near the line.
What does CPBC stand for?
Combined power/brake control