Sandringham Flashcards
(12 cards)
Speeds length of line
70
Controlling Signaller - FSS to RMD
Caulfield panel Metrol
Controlling Signallers remaining
Brighton Beach and Sandringham
Elaternwick is controlled by who?
Caulfield signal control panel and local Signaller is not recorded. In fleeting mode / switched out.
Terminating Acronym - locations
Elaborate Bull Shit
Elsternwick
Brighton Beach
Sandringham
Terminating at Elsternwick
Annett Key & use walking path
Station limits - home signal to home signal
Terminating - Brighton Beach
Down - change ends & green flag
Up - detrain and drive to walking path
Track Layout
3-4, 6-10, 12 and 13 from FSS to Sandringham
Stabling locations
Bull Shit
Brighton Beach
Sandringham
Stabling - Brighton Beach
A & B 1 x 6 car train
Shared dwarf
Run to sandy then change ends on walking path
Do not start train prep before 5:40am
Stabling - Sandringham
4 rds incl plat 1 x 6 car
3 & 4 share a dwarf
MBR plat side of Rd 1 & 2
Caution order ?
Handed at BBH and SHM and ELS if attended due to not being recorded