Q

foreign architects reqs

A

(1)must secure a temporary/special permit
(2)work permit from dole
(3)must work in collaboration with a local architect who is RLA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

are not authorized to provide architectural services for projects located on Philippine soil

A

business process outsource (bpo) and knowledge process outsourcing (kpo)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

bpo and kpo are not allowed in ph unless???

A

they are prc-registered architectural firms satisfying sec 37 ra no. 9266

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

architects work starts at

A

inception of the project when the owner outlines his requirement to architect

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

scope of services (regular design services)

A

project definition phase
schematic design phase
design development phase
contract document phase
bidding or negotiation phase
construction phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

phase involves the definition of the requirements of project by owner

A

project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

architects inform owner of the technical requirements of the project and concomitant professional fees

A

project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

consults with the owner for a conceptual framework and related requirements of project

A

project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

gathers relevant information and data leading to the definition of project requirements of project

A

project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

reviews and refines the owner’s space requirements

A

project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

prepares an initial statement of probable construction cost

A

project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

phase consists of preparation of schematic design studies derived from project definition phase, leading to conceptual phase

A

schematic design phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

evaluates the owner’s program, schedule, budget, project site and proposes methods of project deliveries

A

schematic design phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

prepares the initial line drawings representing design studies leading to a recommended solution

A

schematic design phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

submits to owner a statement of probable project construction cost (sppcc)

A

schematic design phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

documents consisting of plans, elevations, sections and other drawings

A

design development phase

17
Q

outline specifications to fix and illustrate the size and character of entire project as to type of materials, etc

A

design development phase

18
Q

diagrammatic layout of construction systems

A

design development phase

19
Q

updated sppcc for submission to the owner

A

design development phase

20
Q

prepares the complete contract documents consisting of detailed designs and construction drawings

A

contract document phase

21
Q

technical specifications describing type and quality of materials, finish, manner of construction and general conditions

A

contract document phase

22
Q

submits to owner 7 sets of construction drawings and technical specifications for building permits

A

contract document phase

23
Q

updates the sppcc based on changes in scope, requirements, or market conditions

A

contract document phase

24
Q

assists the owner in filling the required documents to secure approval of government

A

contract document phase

25
architect prepares the bid documents for construction, forms for invitation, and instruction to bidders
bidding or negotiation phase
26
assists the owner from early stage of establishing list of prospective contractors
bidding or negotiation phase
27
furnishes complete sets of bid documents for purposes of bidding in as many sets as may required
for competitive bids / procurements, the architect
28
the contract documents
are intellectual property of architects and must be returned
29
helps in organizing and conducting pre-bid conferences
for competitive bids / procurements, the architect
30
responds to questions from bidders
for competitive bids / procurements, the architect
31
assists the owner in obtaining proposals from contractors, amalyzes bid results and prepares abstract of bids
for competitive bids / procurements, the architect
32
architect perform similar function but negotiates with one contractor only
negotiated contracts
33
makes decision on all claims of the owner and contractors on all matters relating to execution and progress
construction phase
34
prepares change orders, gathers and turns over to the owner written guarantees required of contractor and sub-contractor
construction phase
35
prepares change orders, gathers, turns over to the owner written guarantees required of contractor and sub-contractor
construction phase
36
makes periodic visits to the project to familiarize himself with general progress and quality of work and to ascertain that proceeding in accordance with contract documents
construction phase
37
determines amount of owing and due to contractor and issues corresponding certificates of payment for such amounts
construction phase
38
should more extensive inspection of full-time (8-hr) construction supervision required by client
construction phase
39
manner of providing services
(1) with a single contract between architect and owner (2) with separate contracts with architect and engineer, other allied professionals