Q

What are some common pitfalls in repair specifications (x5)?

A
  • Access
  • Cleaning surfaces
  • Removal of concrete
  • Profile restoration (e.g. poor mixing, poor compaction)
  • Surface protection systems (e.g. thickness of coats)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Name the different components of the bills of quantities

A
  • General items (e.g. access, trial sample repairs)
  • Surface cleaning, inspection, testing
  • Repair process
    .
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What standards is used for the site application of products & systems, and quality control of the works?

A

BS EN 1504-10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

For substrate concrete, what tests would be used for:

a) compressive strength
b) surface tensile strength
c) roughness

A

a) core
b) pull-off strength
c) sand area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

For substrate concrete, what test would be used for:

a) chloride penetration
b) depth of carbonation
c) crack width and depth
d) crack movement

A

a) dust drilling
b) fracture face
c) visual (ultrasonics)
d) visual (monitoring)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

For reinforcement, what test would be used for:

a) size
b) section loss
c) degree of corrosion
d) resistivity meter
e) surface electrode potential
f) cover

A

a) visual
b) visual
c) visual
d) resistivity meter
e) half-cell
f) covermeter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

[NAQ] bond coat and rebar coat tests

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

[NAQ] high-strength concrete and plain cement concrete tests

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

For factory vs site production:

a) how do you know if a factory product is prequalified?

b) how must a site-mixed produced is compliant?

A

a) it is CE-marked

b) it must prove compliance (ie. site compliance testing) with performance requirements for the actual materials to be used in the works

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are six watchpoints in quality control?

A
  • Break-out (e.g. chase back until uncorroded steel is found)
  • Priming the concrete (cement-based)
  • Priming the concrete (epoxy)
  • Mixing the repair mortar
  • Placing the repair mortar
  • Applying the SPS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Describe the components of a detailed condition survey

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Describe the preventative maintenance and repair principles (x3)

A
  • Remove the corrosion initiator (e.g. chloride contamination)
  • Replace cracked/delaminated material with new concrete/mortar
  • Enhanced protection [(e.g. SPS to prevent ingress, extra cover (e.g. sprayed, recast)]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are two protection systems in BS EN 1504

A

Hydrophobic system
- prevents water, harmful substances from penetrating (more durable)

Cathodic protection
- prevents steel corrosion, makes steel cathode of an electrochemical cell

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are two problems with hydrophobic treatment?

A
  • Doesn’t impact structure of concrete; no barrier
  • Carbonation can increase
How well did you know this?
1