Test 01 Flashcards
- Architect Mat Ching was commissioned to do a residential project. Everything worked out until everything was done except that the owner ran out of budget to start the construction. According to the law, how much is Arch. Mat Ching entitled to collect?
1 punto
A. 80%
B. 90%
C. 100%
D. 85%
B. 90%
- What law prescribes the Licensure exam of PRBOA?
1 punto
A. RA 8189
B. RA 9266
C. RA 9626
D. RA 1594
B. RA 9266
- An honorary award given to a member by UAP for showing
excellence on the profession of architecture in the Philippines?
1 punto
A. National artist
B. LIKHA award
C. Presidents Award
D. Honorary Fellow
B. LIKHA award
- What is the necessary requirement before practicing the Profession of Architecture?
1 punto
A. Approval of PRC
B. Oath of Profession
C. Licensure Examination
D. Approval of UAP
B. Oath of Profession
- WhatdoyoucalltheOwner-ArchitectagreementwiththeEngineer-allied?
A. Separate
B. Compound
C. Single
D. Dual
B. Compound
- Award given to an individual for its great contribution in Philippine arts?
1 punto
A. National artist
B. LIKHA award
C. Presidents Award
D. Honorary Fellow
A. National artist
- Award given by the Professional Regulation Commission every year to a profession for its great contribution?
1 punto
A. Outstanding Profession of the Year Awards
B. PRC award
C. Presidents Award
D. Outstanding Architect Award
- Prestigious award given to a fellow from UAP because of outstanding professional services and to organization services?
1 punto
A. Most outstanding Architect of the year
B. PRC award
C. Presidents Award
D. Outstanding Architect Award
Situation (9-11): Jem wants to build a rest house in his lot at Minglanilla. He talked with his friend, Ron about the project. Jem’s daughter also recommended Interior Designer B to her mom. However, while browsing a magazine, he learned about Architect C, who also happens to be an Interior Designer at the same time.
1 punto
Option 1
9. What is the best method for him to select the designers?
1 punto
A. Select Ron, since a friend
B. Comparative Selection
C. Design Competition
D. None of the choices
- Why is it best to select Architect C?
1 punto
A. He can get a discount on ID services
B. He can best interpret the Architectural Drawings for the Interior Design
C. It’s not best to choose Architect C since you don’t know her
D. Select Both Architects so that it’s not unfair
- If Architect C is hired, how will he be compensated?
1 punto
A. 10% for Architect’s regular rate + 15 for ID’s regular rate
B. 10% for Architect’s regular rate + 10 for ID’s regular rate
C. 10% for Architect’s regular rate + 12 for ID’s discounted rate
D. MDPE
- It is concerned with thecreation of sustainable value, on a product, a process, a project, an organization or on wider society issues. It achieves such results with relatively low investment and risk to the organization, and can and indeed should be integrated with existing management initiatives and systems.
1 punto
A. Value engineering
B. Value management
C. Sustainable Design
D. None of the choices
- Which of the following does NOT constitute the post-construction services of the architect?
1 punto
A. Post-construction evaluation
B. Building/equipment maintenance
C. Real property evaluation
D. Building/ground administration
- With regards to responsibilities of Architect to his CLIENT, which of the following is/are expected of the Architect?
1 punto
A. Presents examples of professional experience
B. Explains conditions of project cost estimates
C. Ascertains exact nature/scope of services/professional fees
D. All listed items
15.Which of the following is NOT related to Architects regular design services?
1 punto
A. Preliminary drawings
B. Schematic drawings
C. Design development drawings
D. All listed items
15.Which of the following is NOT related to Architects regular design services?
1 punto
A. Preliminary drawings
B. Schematic drawings
C. Design development drawings
D. All listed items
- What do you call to an architect on post-construction services?
1 punto
A. Business Management
B. Building Management
C. Business Administrator
D. Building Administrator
- Which of the following is NOT performed by the architect under the design-build services by administration?
1 punto
A. Keeps records and books of accounts
B. Advances funding for payment of expenditures connected with the work
C. Appoints construction superintendent, purchasing agent, timekeeper, property clerks, etc.
D. Prepares schedule of work, construction program, construction estimates, bill of materials, etc.
- Which of the following is the most disadvantageous to both architect and client as a method of compensation?
1 punto
A. Per diem plus reimbursable expenses
B. Percentage of construction cost
C. Lump sum or fixed fee
D. All listed items
- If there is a conflict in both drawings and specs, the contractor, with the architect’s permission, shall submit to the owner proposals as to which method or material is required. If the less work expensive is done what must he do?
1 punto
A. The contractor shall credit the owner the amount equivalent to the difference of the expensive and less expensive work
B. He must consult the architects estimate
C. He must stop the work until client decision is made
D. None of the above
- Contractor shall prepare at his own expense and submit how many copies of all shop drawings to the architect, who will make the necessary corrections?
1 punto
A. 3
B. 2
C. 3
D. 4
- All permits and licenses necessary shall be secured and fees paid by?
1 punto
A. Owner
B. Contractor
C. Architect
D. PM
- What is the minimum width of staircase if there are 50 occupant load in a building?
1 punto
A. 750
B. 900
C. 1100
D. 1200
- What is the arrangement and control of sounds inside a building?
1 punto
A. Sound design
B. Interior design
C. Acoustic design
D. Sound control