Vince's Notes Flashcards

(101 cards)

1
Q

• PTP

A

Pole top pin.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

• Secondary Triplex

A

2 hot legs with one neutral

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

• Bank

A

a group of capacitors or transformers mounted together

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

• Birdcage

A

Guy wire dispenser

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

• Bell

A

an insulator with a singlewide skirt which can attach to another insulator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

• Blanket ir

A

Improvement requisitions for construction jobs under $25,000

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

• AWG

A

American wire gauge (wire size).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

• Quadaplex wire

A

3 hot legs with 1 neutral.

*Always 1 neutral wire on triplex or quad.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

• Sch. 80 and 40

A

refers to thickness of conduit.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

• A hand hole

A

is a small vault.

• Hand holes are made of polymer concrete or with high-density polychylene plastic.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

• ZR46

A

is the transaction for job returns

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

• Dx

A

Dual primary voltages capabilities of a transformer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

• OH

A

Overhead

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

CU

A

Copper

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

UG

A

Underground

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Transformers

A
  • x label designates a primary voltage of 7200v.
  • The N label designates a 25kva unit.
  • The h label designates a 15kva unit.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

• Cross arms

A

Typical size: 9-8 pins. Others include: 2,4,6,8,10 pin
• Puget arms are made of Douglas fir.
• Wooden cross arms are predrilled with insulator pinholes and mounting holes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

• Primary

A

Conductor energized at over 750 volts.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

• Secondary

A

Conductor energized below 750 volts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

• Single phase

A

a voltage that is generated in a single winding of a generator. Abbreviated as 10.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

• Three phase

A

A polyphase system of three equal voltages with fixed phase differences. Abbreviated as 30.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

• Thumper

A

Underground fault locator.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

• Transmissions

A

Lines and equipment from a primary source of supply to distribution center of wholesale point. Typically a higher voltage then distribution

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

• Distribtuion

A
  • Lines and equipment between transmission facilities and point of delivery to the customer.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
• Framing
The configuration of attaching guys, insulators and cross arms to poles.
26
• Deadend(deaded?)
In line construction where the conductor is terminated on one or both sides of a cross arm.
27
• H-frame
A type of pole construction using two or more poles and the poles are joined by cross arms and or braces
28
• Jumper
Electrical connection between two points
29
• Service
Conductor which runs from point of service (transformer or hand hole) to customers service entrance.
30
• Run
A length of underground (ug) wire between two points
31
• Takedown
Material removed from service.
32
• Whip
Preformed guy grip.
33
• P.E. Gas Pipe
A shelf life of two years before having to go into service
34
• DB-120
(most common at PSE) shipped in 20’ lengths.
35
• SCH 40
is shipped in 10’ lengths (substation use only)
36
• SCH 80
Shipped in 10’ lengths (used where higher strength is needed).
37
• MSDS
Material Safety Data Sheet.
38
• Inspection Code A
The basic inspection provided by stores personnel to ensure the material arrived undamaged and conforms to description of purchase order (p.o.)
39
• Inspection Code B
This inspection is product specific and administered by performance group
40
• Fifo
First in First out.
41
• Lifo
Last in First out
42
• ME52N
Delete/change requisition of materials (when changing always check status tab to see if p.o. has been created).
43
• MBIB
Transfer posting into blocked stock.
44
• ME51N
After creating the requisition, it will first need to be emailed to the planners for their approval to release material.
45
• Returns
* Migo- Leaves overhead. | * MBST- cancels all overhead cost.
46
• Reservation
To change use reservation icon and select change after you have created reservation.
47
• Transaction (ZMRSTDCAT)
To display material info and specs. OR long text in SAP: - Right click on 1000 inventory quantity. - Click on display material. - Click on GOTO(1). - Click on purchase order text. * Information on material is there.
48
• Reviewing MRP for proper order procedure
Example would be to see if item is stores stocked (Zi) or contract item (ZZ).
49
purchase requisition
an internal document used for initiating an order to the purchasing department for goods and services
50
• Release orders are processed
against an out-line agreement contract
51
• Direct sales solicitation by suppliers should be
referred to standards
52
• All purchase requisitions should be
approved by planners/supervisors/management
53
• Ordering of PVC conduit for common carrier load through central stores is accomplished by
an email form
54
• A specialty item (non-coded) is
stores materials which is not centrally stocked at all stocking store rooms (all of above).
55
• Material ordered from a stocked storeroom may not be
available in all cases
56
• Review of quantities and descriptions of incoming orders at central stores is done by the
OSS (clerks).
57
• When transferring material to central stores the transferring storeroom enters
the transfer
58
• Operations employees
have the responsibility to prepare the bad order equipment tool tags for defective material
59
• Obsolete material
Materials, which have been determined to be of no further use
60
• SAP- Assigns stores material codes
to material
61
• Material management supervisor
Has the responsibility of determining the annual inventory schedule.
62
• Internal Auditing
May visit during an inventory to verify material and count
63
• Stores adjustment forms
Are for discrepancies and inventory adjustments.
64
• Padmount switches
Are not within meter department responsibility
65
• Standard Spec
When ordering material, it ensures that material received is the correct product purchased
66
• Common carrier
A commercial freight truck
67
• AMI
Approved manufacturers index
68
• Process a repair request with a “y” by:
Issuing from truck, then transfer from stock
69
• To process a repair request with an “N”:
issue from truck
70
• Shipping records
Normally from Nis or non-coded material stuff that we don’t have to enter into sap. Want signatures so we can track items
71
• Non-stores stock material is always obtained through
a purchase requisition. And has to go through purchasing.
72
• Vendors and suppliers
supply us with our material
73
• MRP
Minimum recorder point. For recorder points and inventory levels for our materials. Planners are MRP Controllers.
74
• 3 r’s
Release orders, reservations, requisitions
75
• A purchase requisition for material is sent to
purchasing department. Needs purchasing’s approval for the material. We go through purchasing to obtain our material.
76
• Ordering of Pvc conduit by our svc center bases….
They can only order two bundles of each type at a time from central stores. If they need more they need to order through supplier directly.
77
• In case of stock out condition:
First contact other storerooms for availability of material needed. If not available at nearby storerooms contact material planners.
78
• OSWO
Oh sorry we’re out!
79
• Defective material
Material that doesn’t match manufacturers specifications on p.o.
80
• Scrap shipping records
Scrap metal that is unable and has certain market value and is shipped for scrap
81
• Inventories
all storerooms have a yearly inventory • If coded item isn’t on the inventory sheet, add to the bottom of sheet and put location found. • Large dollar items require two people to count.
82
• ZR42
Used to track movement of materials (see who is ordering what)
83
• Obsolete material
has no further use the company and is written off.
84
• No gifts accepted
from suppliers(see CP6)
85
• Copper wire & Aluminum wire
have lower resistances | • Steele has higher resistance, primarily used for guying.
86
• The cost of copper affected the change to
use aluminum wire in PSE’s system.
87
• 750 kcmil=
k= 1000
88
• Black jacket with motion
Red stripe
89
• Dx
Dual primary voltage (tap changer on transformer)
90
• Substations reduce and increase
voltages
91
• Reservations need to be sent in by
noon of the day before drayage
92
• Before sending in reservation
do an MB25 to see if a reservation already exists. Also check for backorders pending that will be shipped on order.
93
• Requisitions have to have
requestor’s name and phone number in head deck text
94
• For release order
you need to know which planner to email for release of material
95
• MRP Controller tab on sap contains
planners and what they are in charge of ordering
96
• A gang-operated switch operates
three phases at the same time
97
• A three phase and single phase padmount transformer sits
above ground on a vault
98
• WISHA
(the Washington Industrial Safety and Health Act of 1973)
99
• OSHA
(the federal Occupational Safety and Health Administration)
100
• DOSH
(the Division of Occupational Safety and Health)
101
• Al-1000 and AL250(Ac250 gas meters??) are used to
conduct footages at South King