Week 3 Review Flashcards
A treatment room must not have floors that are ___
Carpeted
In order to maintain good ergonomics between clients, a busy esthetician should ____
Stretch and take deep breaths
How should single-use supplies be treated after use?
They must be disposed of in a covered waste receptacle
In order to best increase efficiency, a technician should _____
practice pre- and post- service techniques
A technician’s day would typically begin with ____
checking the schedule to see what clients will be coming in
After a service, disposable lancets must ___
be placed in a sharps disposal container
Preheating a towel warmer and wax heater can take as long as
15 minutes
What should towels be before they are put in the towel warmer?
wet
How should supplies be handled after they are placed on a clean and disinfected workstation___
They should be covered with another towel
Before preparing the treatment table with fresh linen, the technician must
wash hands
In order to sterilize implements, a treatment room should have a
autoclave
When budgeting time to prepare the room for a facial service, estheticians should expect it will take
10 min
In a treatment room, it is optional to have ___
a UV sanitizer
What is the name for tools that perform services
Implements
Who would not typically need a steamer during a facial procedure?
Clients with sensitive skin
When cleaning the towel warmer, ____.
the door should be left open so the warmer can dry
SDS’s are
information forms about products
If required, record on a dated log when the ____ is changed to comply with the manufacturer’s directions and infection control regulations
disinfectant
What considerations must be made when designing a treatment room?
It must allow the esthetician to move comfortable in the spa
After a service, soiled linens should be ___.
the linens should be rolled inward
In order to prevent contamination and protect your hands, you should ____.
wear gloves for all procedures.
How can a technician best assist the client in the treatment room?
By explaining details about how to prepare for the procedure
What is necessary for waste containers in treatments room?
They must be closed and covered
What is the most important thing to consider when furnishing a treatment room?
Health and safety