CIDQ Official Practice Test Flashcards

1
Q

Which of the following is the MOST important consideration in planning for a small open office project?

Management of overall cost per square foot
Specification of appropriate materials and finishes
Maintaining ratio between circulation and work area
Support of job function and relationships

A

Support of job function and relationships

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When beginning a schematic floor plan for an existing building, what is the MOST effective sequence of adding spaces to the plan?

Building core, largest spaces, general circulation, public spaces, then other room allocations

Building core, public spaces, largest spaces, other room allocations, then general circulation

Public spaces, general circulation, largest spaces, other room allocations, then building core

Largest spaces, other room allocations, general circulation, public spaces, then building core

A

Building core, largest spaces, general circulation, public spaces, then other room allocations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A client would like to install a window in a 60-minute rated door in a corridor. Which of the following would be acceptable?

10” x 10” [250 mm x 250 mm] wired glass
6” x 12” [150 mm x 300 mm] wired glass
10” x 10” [250 mm x 250 mm] tempered glass
6” x 12” [150 mm x 300 mm] tempered glass

A

10” x 10” [250 mm x 250 mm] wired glass

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Which of the following is a characteristic of a halogen lamp?

Easy to install and maintain
Cannot be dimmed
Requires a transformer at the switch
Brighter than other incandescent sources

A

Brighter than other incandescent sources

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What type of carpet construction has no separate primary backing?

Knitted
Woven
Tufted
font-default-tick Fusion-bonded

A

Woven

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which of the following documents are MOST likely to be included in the design development package?

Technical drawings, schedules, and specifications required to price, build, and install the work

Any documents required to communicate compliance with applicable codes to local authorities responsible for issuance of permits

Technical drawings, images, and samples communicating design intent and client requirements

Detailed floor plans, ceiling plans, elevations, sections, design details, millwork drawings, and material samples and specifications

A

Detailed floor plans, ceiling plans, elevations, sections, design details, millwork drawings, and material samples and specifications

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When are three-dimensional studies MOST useful in the design process?

In the final contract document presentation
During the programming phase
As a rough sketch during the schematic stage
Throughout the entire design process

A

Throughout the entire design process

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When presenting the preliminary design and design concept of an office space to a client, what information should be included?

Preliminary floor plan, orthographic drawings, and rendered perspectives

Bubble diagrams, preliminary floor plan, and conceptual sketches

Dimensioned floor plan, orthographic drawings, and sample boards

Bubble diagrams, conceptual sketches, and sample boards

A

Bubble diagrams, preliminary floor plan, and conceptual sketches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which of the following is MOST important to include when preparing documents for the schematic presentation to the client?

Zoning diagrams
Stacking diagrams
Blocking plans
Floor plans

A

Floor plans

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What should be done before starting schematic design work on an office renovation with no existing electronic plans?

Develop program, field verify and document existing conditions
Obtain the original drawings, field verify and document existing conditions
Obtain the original drawings, develop construction documents
Develop preliminary plan, establish project budget

A

Obtain the original drawings, field verify and document existing conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The difference between a precedent study and a case study is that the case study:

refers to a social aspect of a project.
refers to a project utilizing the newest theories.
has not been realized in physical form.
refers to an innovation in design.

A

refers to a social aspect of a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is identified in a precedent study?

The design solution
New building sites
Programmatic needs
Design team members

A

Programmatic needs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which aspect of lighting design should be addressed FIRST?

Lighting concepts using preliminary plans
Daylighting opportunities in the design
Reflected ceiling plans and details
Lighting control locations and circuiting

A

Daylighting opportunities in the design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

In terms of occupant health, which of the following lamp types is BEST for use in a bedroom?

LED lamp
Fluorescent lamp
Incandescent lamp
Clear mercury vapor lamp

A

Incandescent lamp

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Which of the following is a coordinator of voluntary standards development?

UL
ASTM
ANSI
ASHRAE

A

ANSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What method would the designer use to evaluate materials and finishes for a project without knowledge of the building standard lighting temperature?

Specify new light fixtures throughout to best match the materials and finishes
Evaluate the materials with two light sources of different spectral character
Evaluate the materials outdoors under direct sunlight
Request that all of the fixtures be re-lamped for consistent color temperature

A

Evaluate the materials with two light sources of different spectral character

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is the MINIMUM required lighting level for a path of egress in a commercial space?

1 foot-candles (11 lux)
5 foot-candles (54 lux)
10 foot-candles (108 lux)
15 foot-candles (161 lux)

A

1 foot-candles (11 lux)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Which specification type is used when documenting a custom reception desk, with specific fabrication, materials, and installation methods?

Reference
Performance
Descriptive
Proprietary

A

Descriptive

19
Q

When dimensioning a stair section what must be called out to make sure the stair is built to code?

Handrail height
Nosing radius
Stair width
Landing size

A

Handrail height

20
Q

During which design phase would an interior designer start an outline specification?

Design development
Schematic design
Contract documentation
Contract administration

A

Schematic design

21
Q

Upon completion of the following tasks, what should the interior designer do NEXT? • Interview client. • Obtain architectural drawings. • Conduct a site inspection. • Prepare preliminary sketches. • Evaluate existing furniture for continued use.

Review sketches and furniture layouts with your design firm’s owner.

Review preliminary specifications with the manufacturer’s representatives.

Present choices to the client’s purchasing department.

Note dimensional discrepancies on the architectural drawings.

A

Review preliminary specifications with the manufacturer’s representatives.

22
Q

What code deficiency exists in the accompanying drawing depicting an entrance door to a 1,500 sf [140 m2] suite, a corridor, and an exit stair door in a five-story office building?

The suite entrance door is too close to the fire exit.

The exit stair door is not equipped with quick release (panic) hardware.

A dampered duct opening is located in the exit stair wall.

Exit signage should be beside, not over, the exit door.

A

A dampered duct opening is located in the exit stair wall.

23
Q

In which space is emergency lighting REQUIRED?

Elevators
Private offices
Egress corridors
Restrooms

A

Egress corridors

24
Q

What has the GREATEST positive impact on life safety in an open office?

Heat detection
Operable windows
Building egress
Fire equipment location

A

Building egress

25
Q

The typical chronological order of system installation in new commercial construction is:

HVAC, Plumbing, Electrical
Electrical, Plumbing, HVAC
Plumbing, HVAC, Electrical
Electrical, HVAC, Plumbing

A

Plumbing, HVAC, Electrical

26
Q

Which of the following has the GREATEST impact on the effectiveness of an HVAC system?

Rooftop chiller size
Wall insulation type
Window treatments
Occupancy load

A

Occupancy load

27
Q

What is the result of withholding external fresh air from an HVAC system?

Unit efficiency is diminished
VOC build-up becomes more concentrated
Electrostatic filters are required
Condensation builds up in the ducts

A

VOC build-up becomes more concentrated

28
Q

A final construction budget for an office remodeling project is 10% higher than the client anticipated. What strategy would be MOST effective in lowering the costs?

Ask the contractor to use less expensive substitutes.
Select less expensive finish materials.
Reevaluate the area requirements with the client.
Create a new, simpler space plan.

A

Select less expensive finish materials.

29
Q

What method of scheduling, ideal for small projects of low complexity, indicates each team member’s responsibility and the projected timeline for each task from initiation to its completion?

Preemptive
Shared
Milestone
Critical path

A

Milestone

30
Q

Why are addenda issued?

To provide additional information not included in the bid package
To inform potential bidders about acceptable alternates
To obtain additional information
To request a change during construction

A

To provide additional information not included in the bid package

31
Q

Who is responsible for specifying and indicating heat detector devices on the drawings for a classroom project?

Fire-protection Engineer
Interior Designer
Electrical Engineer
Architect

A

Fire-protection Engineer

32
Q

What is the MINIMUM width required for a bedroom that is 10 ft. [3.05 m] long?

6 ft. [1.83 m]
7 ft. [2.13 m]
8 ft. [2.44 m]
9 ft. [2.74 m]

A

7 ft. [2.13 m]

33
Q

The occupancy load threshold requiring an increase from two to three egress doors per story is:

100
250
300
500

A

500

34
Q

A textile drapery intended for use on walls in a new concert hall must pass which standard test?

NFPA 269
NFPA 286
ASTM D6413
ASTM E2257

A

ASTM D6413

Standard Test Method for Flame Resistance of Textiles (Vertical Test)

35
Q

An Interior Designer is finishing a basement for a client and her family that includes a game room, 3/4 bathroom, laundry room, a bedroom, and the mechanical room for the home. The overall unfinished ceiling height is 8’-6” (2590.8 mm) and the home is forced-air, wood frame construction built in the late 20th-century. What would be the most appropriate wall and ceiling construction assembly in the basement?

Gypsum board ceiling throughout, walls to the underside of the sub-floor above, with acoustical batting

Combination of gypsum board and suspended acoustical tile ceilings, insulated walls to the finished ceiling height

Suspended acoustical tile ceiling, insulated walls to the underside of the sub-floor above

Combination of gypsum board and suspended acoustical tile ceilings, insulated walls to the underside of the sub-floor above

A

Combination of gypsum board and suspended acoustical tile ceilings, insulated walls to the underside of the sub-floor above

36
Q

Which of the following architectural elements can contribute to a daylighting strategy?

Flat white paint
Exposed concrete floor
Low-emissivity glass
Insulation with high R values

A

Low-emissivity glass

37
Q

When evaluating a systems furniture solution for a client who prefers wide aisles, which characteristic of the system will be MOST critical to achieve the desired aisle width?

Height of panels
Thickness of panels
Length of power
Material of panels

A

Thickness of panels

38
Q

When specifying the installation of ceramic tile, which of the following is required?

Sealant
Adhesive
Reducer Strip
Anti Fracture Membrane

A

Adhesive

39
Q

What is the minimum DCOF (Dynamic Coefficient of Friction) required for tile located in a public space?

  1. 42
  2. 57
  3. 58
  4. 60
A

0.42

40
Q

When a client brings their preferred furniture dealer as part of the project team, what should the designer do to coordinate their efforts?

Coordinate with the Architect and Structural Engineer

Coordinate with the general contractor to schedule furniture delivery

Answer requests for information (RFI’s) on the furniture bid package

Request that all correspondence go through the project manager

A

Coordinate with the general contractor to schedule furniture delivery

41
Q

Which casework grade would be MOST appropriate to specify base cabinets in an elementary school classroom?

Utility
Custom
Premium
Economy

A

Custom

42
Q

Construction documents generally undergo coordination review at which percentage of completion milestones?

50% and 90%
25% and 75%
30% and 60%
50% and 75%

A

50% and 90%

43
Q

A client needs to move into their space as soon as it is substantially complete and the furniture is installed. What is the MOST important task for the contractor to complete?

Punch list (deficiency list)
Post occupancy evaluation
Application for payment
Certificate of occupancy

A

Punch list (deficiency list)