Which of the following is the MOST important consideration in planning for a small open office project?
Management of overall cost per square foot
Specification of appropriate materials and finishes
Maintaining ratio between circulation and work area
Support of job function and relationships
Support of job function and relationships
When beginning a schematic floor plan for an existing building, what is the MOST effective sequence of adding spaces to the plan?
Building core, largest spaces, general circulation, public spaces, then other room allocations
Building core, public spaces, largest spaces, other room allocations, then general circulation
Public spaces, general circulation, largest spaces, other room allocations, then building core
Largest spaces, other room allocations, general circulation, public spaces, then building core
Building core, largest spaces, general circulation, public spaces, then other room allocations
A client would like to install a window in a 60-minute rated door in a corridor. Which of the following would be acceptable?
10” x 10” [250 mm x 250 mm] wired glass
6” x 12” [150 mm x 300 mm] wired glass
10” x 10” [250 mm x 250 mm] tempered glass
6” x 12” [150 mm x 300 mm] tempered glass
10” x 10” [250 mm x 250 mm] wired glass
Which of the following is a characteristic of a halogen lamp?
Easy to install and maintain
Cannot be dimmed
Requires a transformer at the switch
Brighter than other incandescent sources
Brighter than other incandescent sources
What type of carpet construction has no separate primary backing?
Knitted
Woven
Tufted
font-default-tick Fusion-bonded
Woven
Which of the following documents are MOST likely to be included in the design development package?
Technical drawings, schedules, and specifications required to price, build, and install the work
Any documents required to communicate compliance with applicable codes to local authorities responsible for issuance of permits
Technical drawings, images, and samples communicating design intent and client requirements
Detailed floor plans, ceiling plans, elevations, sections, design details, millwork drawings, and material samples and specifications
Detailed floor plans, ceiling plans, elevations, sections, design details, millwork drawings, and material samples and specifications
When are three-dimensional studies MOST useful in the design process?
In the final contract document presentation
During the programming phase
As a rough sketch during the schematic stage
Throughout the entire design process
Throughout the entire design process
When presenting the preliminary design and design concept of an office space to a client, what information should be included?
Preliminary floor plan, orthographic drawings, and rendered perspectives
Bubble diagrams, preliminary floor plan, and conceptual sketches
Dimensioned floor plan, orthographic drawings, and sample boards
Bubble diagrams, conceptual sketches, and sample boards
Bubble diagrams, preliminary floor plan, and conceptual sketches
Which of the following is MOST important to include when preparing documents for the schematic presentation to the client?
Zoning diagrams
Stacking diagrams
Blocking plans
Floor plans
Floor plans
What should be done before starting schematic design work on an office renovation with no existing electronic plans?
Develop program, field verify and document existing conditions
Obtain the original drawings, field verify and document existing conditions
Obtain the original drawings, develop construction documents
Develop preliminary plan, establish project budget
Obtain the original drawings, field verify and document existing conditions
The difference between a precedent study and a case study is that the case study:
refers to a social aspect of a project.
refers to a project utilizing the newest theories.
has not been realized in physical form.
refers to an innovation in design.
refers to a social aspect of a project.
What is identified in a precedent study?
The design solution
New building sites
Programmatic needs
Design team members
Programmatic needs
Which aspect of lighting design should be addressed FIRST?
Lighting concepts using preliminary plans
Daylighting opportunities in the design
Reflected ceiling plans and details
Lighting control locations and circuiting
Daylighting opportunities in the design
In terms of occupant health, which of the following lamp types is BEST for use in a bedroom?
LED lamp
Fluorescent lamp
Incandescent lamp
Clear mercury vapor lamp
Incandescent lamp
Which of the following is a coordinator of voluntary standards development?
UL
ASTM
ANSI
ASHRAE
ANSI
What method would the designer use to evaluate materials and finishes for a project without knowledge of the building standard lighting temperature?
Specify new light fixtures throughout to best match the materials and finishes
Evaluate the materials with two light sources of different spectral character
Evaluate the materials outdoors under direct sunlight
Request that all of the fixtures be re-lamped for consistent color temperature
Evaluate the materials with two light sources of different spectral character
What is the MINIMUM required lighting level for a path of egress in a commercial space?
1 foot-candles (11 lux)
5 foot-candles (54 lux)
10 foot-candles (108 lux)
15 foot-candles (161 lux)
1 foot-candles (11 lux)