CER Progress Test Four Flashcards
(101 cards)
Specific tasks to be done, time horizons for these tasks, and resource allocation are all part of an effective:
a. preventative maintenance program
b. leak testing policy
c. action plan
d. all the above
Action Plan
Quality management measures for endoscopes include repair cost per procedure for each endoscope: True or False
True
When receiving a loaned endoscope that is made by a different manufacturer than what the facility uses, competencies do not need to be done, as long as the endoscope is the same type as the one the facility sent out for repair: True or False
False
Surveyors may ask staff in the endoscope reprocessing area to demonstrate departmental protocols for damaged endoscopes: True or False
True
This department is responsible for providing input into the endoscope use and handling system:
a. reprocessing
b. infection prevention
c. User
d. all the above
All the above
Endoscope leak testing can identify the following problem with a flexible endoscope:
a. user neglect
b. O-rings that are not properly seated
c. damage due to using the wrong cleaning chemicals
d. all the above
O-Rings that are not properly seated
During leak testing, an increase in pressure when moving the elevator levers indicates a leak in the system: True or False
False
When sending a damaged endoscope out for repair, best practices require placing the endoscope in a reprocessing tray to protect it from further damage: True or False
False
Pressurizing a damaged endoscope for cleaning may prevent further damage to that endoscope: True or False
True
When preparing an endoscope for shipping, it is not necessary to include a description of the problem because the service company will inspect the entire endoscope after it is received:
True or False
False
Regulations and standards establish:
a. effective processing guidelines
b. minimum levels of quality and safety
c. a method that has consistently shown superior results
d. all the above
Minimum levels of quality and safety
This organization is responsible for promoting health and quality of life:
a. APIC and Epidemiology
b. US FDA
c. CDC
d. EPA
Centers for Disease Control and Prevention
This regulatory department issues registration numbers for disinfectants:
a. US FDA
b. EPA
c. APIC and Epidemiology
d. AAMI
Environmental Protection Agency
This agency is responsible for enforcing proper labeling of biohazardous material:
a. CMMS
b. US FDA
c. OSHA
d. DOT
Department of Transportation
Failure to follow this agency’s standards can result in loss of all federal funding:
a. OSHA
b. US FDA
c. CMMS
d. CDC
Centers for Medicare and Medicaid Services
The US FDA provides regulatory standards for employee safety:
True or False
False
This action is taken by the US FDA when a medical device is defective or poses a health risk:
a. validation
b. citation
c. 510K
d. recall
Recall
Violating Health Insurance Portability and Accountability (HIPAA) rules may result in job loss. True or False
True
This organization developed and released ST79 and ST91, two important documents that are important to endoscope reprocessing:
a. OSHA
b. USFDA
c. CMMS
d. AAMI
Association for the Advancement of Medical Instrumentation
Common pitfalls for endoscope reprocess include:
a. fatigue
b. misinformation
c. lack of prioritization
d. all the above
All the above
The responsibility for safe and successful reprocessing of endoscopes rests with the :
a. reprocessing technician
b. Instruction for use
c. People who manage the system
d. All the above
People who manage the system
When staff members are properly trained and competent with the process, there is no need for process audits: True or False
False
Information posts are a good way to quickly spread the word of an issue or process change: True or False
True
Delays in reprocessing endoscopes may result in the formation of biofilms and dried soil on/in the endoscope: True or False
True