Chapter 2 End of Book Flashcards Preview

ABH Study Guide Manual > Chapter 2 End of Book > Flashcards

Flashcards in Chapter 2 End of Book Deck (40):
1

How many wheels are on the A/S32A-31A aircraft tow tractor?

6

2

How many wheels are on the A/S32A-32 aircraft tow tractor?

3

3

What is the drawbar pull of the A/S32A-31A aircraft tow tractor?

8,500 lbs.

4

What will normally be mounted on back of the A/S32A-31A aircraft tow tractor?

Starting unit

5

How many different variations are there of the MSU-200NAV?

2

6

Unloaded, the A/S32A-32 aircraft tow tractor’s maximum allowed speed is_______.

5 mph

7

What aircraft tow tractor will be used in areas where there are poor weather conditions for aircraft towing?

A/S32A-37

8

Loaded, the A/S32A-32 aircraft tow tractor’s maximum allowed speed is_______.

2 mph

9

Which aircraft tow tractor is called the mid-range tow tractor (MRTT)?

A/S32A-45

10

The shipboard helicopter handler’s low profile is to permit compatibility with the__________.

SH-60

11

On the MEPP, what is the volts direct current (VDC) provided to give electrical power to aircraft?

28 VDC

12

On the MEPP, automatic shutdown will occur if the engine exceeds__________.

2400 rpm

13

In the GSE licensing process, what official will sign the yellow license upon completion of the phase 2 portion?

AIMD Officer

14

The NWC-4 chock is adjustable to fit main landing gear wheels up to_______.

45 inches

15

The TD-1B has a safe working load of_______.

10,000 lbs.

16

What is the safe working load of the aero full-power tiedown?

30,000 lbs.

17

Which ALBAR is standard for towing most land- and shore-based aircraft?

15

18

Which towbar is especially designed for moving H-46 helicopters on amphibious assault ships?

8 ALBAR

19

What is the length of the 8 ALBAR?

9 feet

20

For technical information on the ALBAR, you should refer to__________.

NAVAIR 00-80T-96

21

When operating the aircraft elevator, a white light illuminated on the control station indicates _________.

that power is available

22

During aircraft elevator operations, what station is responsible for notifying all stations when there is a loss of power?

Machinery room

23

Overall maintenance and operational upkeep of the elevator machinery rooms and systems are the responsibilities of ________.

A Division

24

How many sets of double guided rollers are securely bolted to the elevator platform?

2

25

In the event of a loss of air pressure, what type of gear system is provided for each elevator locking bar on most ships?

Hydraulic

26

In the event of a loss of electrical power during elevator operation with a loaded platform, the residual capacity of the pressure tanks is sufficient to permit________.

raising the platform to flight deck

27

Hangar division doors are designed to provide for_________.

fire containment

28

What Naval Ships' Technical Manual (NSTM) would you refer to for aircraft elevators?

588

29

Hangar bay doors are designed to close within how many minutes?

1

30

What Naval Ships' Technical Manual (NSTM) would you refer to for deck coatings?

634

31

Nonskid is normally applied by the use of what method?

Water-jet

32

What is the service life of nonskid (MIL-PRF-24667) type V composition type L?

3 years

33

What is the service life of nonskid (MIL-PRF-24667) type II composition type G?

6 months

34

When applying nonskid, what official shall specify locations for troweled applications, as well as direction of troweling?

Type Commander

35

How long should primer be stored in the temperature range of 70 to 80 °F prior to mixing?

24 hours

36

When applying primer, it should be allowed to cure until__________.

it is tack free

37

What factor will tremendously effect nonskid cure time?

Temperature

38

Nonskid should normally be fully acceptable for flight operations after_______.

7 days

39

Following 96 hours after application, nonskid can normally be exposed to________.

support equipment traffic

40

The cure time of primer will generally range between _________.

6 to 12 hours