Chapter 2 End Of Chapter Flashcards Preview

ABH Study Guide Manual > Chapter 2 End Of Chapter > Flashcards

Flashcards in Chapter 2 End Of Chapter Deck (30):
0

The A/S 32A-30A is primarily designed for towing

Ground support equip

1

What is the secondary mission of the A/S 32-30A ?

Tow small aircraft

2

The A/S 32A-32 towing tractor (SD-2 spotting dolly) is controlled by the use of a

Joystick

3

What is the maximum towing capacity of the A/S 32A-30A (support equip/ aircraft towing tractor)?

40,000 Ibs

4

The overall height of the A/S 32A-32 towing tractor (SD-2 spotting dolly) is

30 inches

5

What is the drawbar pull of the A/S 32A-32 towing tractor?

14,000 lbs

6

How many phases are there in the ground support licensing program?

2

7

Who will handle the phase 2 portion of the ground support licensing program

Division

8

Phase 2 of the ground support licensing program covers

On the job training

9

What type of material is the NWC – 4 Universal wheel chock made from?

Polyurethane

10

What is the difference between the regular TD – 1B and the type use on amphibious assault ships?

Length

11

For specific information concerning the high powered tiedown assembly for each type of aircraft you should refer to the

MIM

12

When utilizing NWC –4 universal wheel chock, where should the adjustable end of the chock be placed on the aircraft wheel

Aft

13

The TB -1B can be tightened by use of the

Tensioner assembly

14

The 24 ALBAR is designed specifically for what aircraft?

SH-60

15

When the aircraft elevator is loaded to capacity with all pumps in use, what is the total duty cycle time?

60 seconds

16

The horizontal locking bar of the aircraft elevator are powered

Pneumatically

17

Aircraft elevator safety Stanchions should not be operated in

Automatic mode

18

V-1 division is responsible for what part of the aircraft elevator operation?

Flight deck

19

V-3 division is responsible for what part of the aircraft elevator operations

Hanger deck

20

A division is responsible for what part of their aircraft elevator operation

Machinery room

21

There are how many different composition of nonskid

2

22

Nonskid coating kit are supplied in how many components

2

23

The shelf life of nonskid

1 year

24

What is the most preferred method of nonskid removal

Water- jetting

25

In order to ensure the correct primer coverage, the DFT reading must be taken when the primer has

Cured

26

When completing the primer application process what will allow corrosion to set in and degrade the process?

Holidays

27

VLA marking on the hanger deck are placed _______ from the deck

14 feet

28

The ship frame number Markings place on both the starboard and port bulkhead at frame interval of

10

29

For what class ships does the naval air warfare Center visual landing aids general service bulletin No. 8 establish standard certification requirements and inspections?

CVN