Chapter 3: General Regulatons Flashcards

(47 cards)

1
Q

Disposal of sewage, or other liquid waste, shall be by means of _________.

A

The drainage system of the building or premises

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

True or False

A drinking fountain installed outside shall be connected to an approved drainage system.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A connection to the public sewer, or private sewage disposal system, is required for ________.

A

Buildings with plumbing systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Roofs, inner courts, vent shafts, light wells, or similar areas having rainwater drains shall discharge to (a) ___________.

A

outside of the building or to the gutter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Burred ends of all pipe and tubing shall be _______.

A

Reamed to the full bore of the pipe or tube

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

No plumbing system, drainage system, building sewer, private sewage disposal system, or parts thereof, shall be located in ___________.

A

Any other lot other than the lot that is the site of the building served by such facilities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

piping fixtures, or equipment that are installed so that they interfere with normal operation and use of windows or doors shall be ______.

A

relocated to avoid interference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

All design, construction, and workmanship shall be in conformity with __________.

A

Accepted engineering practices

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When supporting horizontal piping 5-inches in diameter with hangers, a __________ inch diameter rod shall be used.

A

1/2 inch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The building drain from the front building may be extended to the rear building when both buildings are located ________.

A

on an interior lot (when driveway can not be used.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

All trenches deeper than the footing of any building or structure and paralleling the same shall be at least _______.

A

45 degrees therefrom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Cast iron soil pipe, installed vertically, shall be supported at its base and ______________.

A

Each floor not to exceed 15 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Threaded pipe (I.P.S.) 3/4 inch, except for gas piping, installed horizontally shall be supported at approximately ________.

A

10-foot intervals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Piping in the ground shall be laid on ________.

A

A firm bed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

True or False

PEX piping may be coup[led together with shielded couplings.

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The type of acceptable joints for PEX shall be ___________.

A

Metal inert or metal compression

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Copper tubing installed vertically shall be supported at each story or at maximum intervals of __________.

A

10 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Tub waste openings in framed construction shall be protected by ________.

A

Metal collars or screns

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Surfaces to be joined by soldering or brazing shall be cleaned bright by _________.

A

Manual or mechanical means

20
Q

Mechanical devices may be used to complete backfilling where covering any piping is at least _________ inches.

21
Q

Two-inch horizontal copper tubing drain pipe shall be supported at _________.

A

10-foot intervals

22
Q

Horizontal hubless pipe shall be braced at no more than 40-foot intervals to prevent ________.

A

Horizontal movement

23
Q

All piping, fixtures, and equipment shall be adequately supported in accordance with the ________.

24
Q

Voids around piping passing through concrete floors on the ground shall be _____.

25
All materials, fixtures, or devices used or entering into the construction of plumbing and drainage systems shall ___________________.
Conform to approved applicable standards
26
The provisions of the code allow an alternate material or method of construction provided it is _________.
approved by the authority having jurisdiction as an alternate
27
I.P.S. is the abbreviation for __________.
Iron pipe size
28
True of False | Section 313.2 prohibits the direct embedment of hubless cast-iron pipe in a concrete slab.
True
29
Closet bends or stubs shall be cut off so as to present a smooth surface even with the ________.
Top of the closet ring
30
Solder and fluxes used in piping systems conveying potable water are prohibited when the lead content exceeds ____________.
0.2 of one percent
31
Joints at the roof, around pipes, shall be made watertight by the use of ________.
Flashing material
32
The minimum wall thickness for threaded plastic pipe shall be __________.
Schedule 80
33
Wall-mounted water closets shall be securely bolted to _________.
A carrier fitting
34
True of False | It is permitted to drill and tap a vent pipe to connect an indirect waste pipe.
False
35
Fixture connections between drainage pipes and water closets shall be made with ___________.
Flanges
36
All pipe, pipe fittings, traps, fixtures, materials and devices used in plumbing systems shall be _____________.
Listed or labeled by a listing agency, approved by the AHJ, and free from defects
37
Sleeves shall be provide to protect all piping through ________ and _______ walls.
Concrete and masonry walls
38
True or False In seismic zones A and B, hubless cast-iron piping 5 inches or larger suspended in exposed locations over high traffic areas , and over four feet in height, shall be provided with support on both sides of the coupling.
False
39
When installing __________, the Authority Having Jurisdiction shall require evidence of the competency of the installer.
Medical gas piping
40
When brazing, the alloys shall have a melting temperature of at least _________ degrees F.
1000 degrees
41
Drain pipes subject to condensation over food storage in food handling establishments shall be ___________.
Thermally insulated
42
What is the section of the UPC that grants the AHJ the opportunity to require tests as proof of equivalency?
301.2.1
43
Test gauges shall not have a pressure range of than _____________.
Twice the test pressure applied
44
If an AHJ permits an 'alternative engineered design,' ______________.
The approval shall have no effect beyond that AHJ boundry
45
A push-fit fitting is assembled by _________________.
Pushing tube/pipe into fitting and is seals with an "O" ring
46
Heat fusion weld joints are used in ________.
Some thermoplastic systems
47
Plumbing systems shall be located above the design flood elevation ___________.
Except when designed to prevent water from entering or accumulating within components