CORE FLOOD Flashcards

1
Q

Power operation with one idle RCP in each loop shall
be restricted to how long? If the reactor is not
returned to an acceptable RC pump operating
combination at the end of the time period, the reactor
shall be in what condition in the next how long?

A

24 hours
24 hours, then the reactor shall be in hot shutdown
condition within the next 12 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Each safety related snubber shall be operable.
Whenever the system protected by the snubber is
required to be OPERABLE with one or more subbers
inoperable, within 72 hours replace or restores the
inoperable snubbers to OPERABLE status and
perform engineering evaluation OR what do you have
to do ?

A

DECLARE THE ATTACHED SYSTEM INOPERABLE
AND FOLLOW THE APPROPRIATE ACTION
STATEMENT FOR THAT SYSTEM.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Core flood
Purpose

A

Floods core when RCS pressure drops below 600#

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Basis for Core Flood

A

Need both CFT’s to completely re-flood core for hot
and cold line breaks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

10CFR50.46 acceptance criteria, injects borated water
for what reasons? (5)

A

Limit peak cladding temp < 2200 degF
- Limit cladding oxidation < 17% of total cladding
thickness
- Limit hydrogen generated zirc-water reaction <1%
if all cladding were to react.
- Ensure a coolable core geometry
- Establish long term cooling for DHR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Minimum required for ECCS analysis for core flood

A

2 CF tanks
1 HPI train
1 LPI train

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

CF-V-1A/B
What position are the valves normally positioned?

A

Normally OPEN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Procedurally
During heat up position valves which way at what
pressure
During cooldown

A

Open valves when RCS between 650# and 700#
during heatup
Close valves when RCS between 700# and 650#
during cooldown

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

If valves out of position for current RCS pressure what
alarm do you get?

A

Alarm D-3-8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

CF-V-1A/B
Power supply
Breaker normally what with EST applied
Where do you have indication as required by T.S?

A

1C ESV MCC
Breaker normally open
Still have indication on ES status panel as required
by T.S.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Core Flood Nozzle
Limits flow out of the reactor vessel in the event of
what?

A

In the event of a core flood line rupture

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

CF Tank sample/drain outlet isolation, CF-V-2A/B
Power supply
Closes on what ES on which train?

A

1A ESV MCC
CLOSE on 4# ES (A’ Train) and RTI (A’ Train)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

CF Tank sample/drain CF-V-20A/B
Power supply
Interlocks (4)

A

1F DC (B’ train) via XCL
Interlocks (closed on ALL)
1.) Loss of DC
2.) Loss of IA
3.) 4# ES (B’ train)
4.) RTI (B’ Train)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

CF tank vent to vent header, CF-V-3A/B
Power supply
Bkr normally what with EST applied?

A

Powered from 1A/B RW MCC
Breaker normally open, EST applied

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

CF tank makeup (N2 or H20) isolation CF-V-19A/B
Power supply
Interlocks

A

1M DC via XCR
Interlocks all closed on the following:
1.) Loss of DC
2.) Loss of IA
3.) 4# ES (A’ or B’ train)
4.) RTI (A’ or B’ train)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Operating parameters
Nitrogen Makeup:
Normal band
Psig overhead alarm D-2-7/8
Psig required by tech specs

A

Normal band 590-610 psig
Psig overhead alarm 585-615 psig
Psig required by tech specs 575-625

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Level/Boron Makeup
Can fill tanks from MU system, but not while what?
Normal bands?

A

But NOT WHILE CRITICAL
Normal band: 11.35 – 11.81 ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Boron
Normal band
Required by tech spec band

A

Normal band: 2350-2750 ppmB
Required by tech spec band: >2270 ppmB

19
Q

Level/Boron Makeup
Temperature
Normal band
CF tank metal temperature low alarm?

A

Normal band >70 degF but <140 F
CF tank metal temp low alarm: 75 F

20
Q

Limits and precautions
OP-TM-213-000
CF level indication will be erroneously high with the
tank depressurized. Level indication is approximately
how many inches above actual when CFT pressure is
what?

A

7” above actual when CFT pressure is 0

21
Q

Limits and precautions
OP-TM-213-000
To avoid an invalid reading, do not allow CF-Tank level
to exceed how many ft? exceeding that limit will result
in filling the CF tank what with water?

A

Exceeding 14ft
Filling the CF tank reference leg with water

22
Q

During startup, the core flood tank isolation valves
must be in what position? When the reactor coolant
system pressure rises to what pressure? But is less
than what pressure?

A

Core flood tank isolation valves must be OPENED
when reactor coolant system pressure rises to 650
psig, but is less than 700 psig.

23
Q

During normal reactor plant cooldown, what position
do core flood tank isolation valves go to when reactor
coolant pressure drops to less than what pressure but
greater than what pressure?

A

Core flood tank isolation valves CLOSED

24
Q

Normal vent path

A

Waste gas header, normal vent **

25
Normal fill path
Fill from 4% boric acid tank****
26
To avoid CF tank NDTT concerns, do not all CF thank pressure to exceed what pressure when tank metal temp is
140 PSIG <70 F
27
If RC-RV-2 is not operable, to avoid Low Temperature over pressure conditions (LTOP), do not allow CF tank pressure to exceed what pressure when RCS temp is < what temp?
590 psig <313 F
28
Tech spec limit Tank level
11.13-12.01 ft (940 +/- 30ft^3)
29
Tech spec limit tank pressure
N2 (470 ft^3) 600 +/- 25#
30
Tech spec limit Boron
>2270 ppm
31
Tech spec temp
>70F
32
To avoid LOCA heat removal concerns contained within system design basis, do not allow CF tank temperature to exceed what temperature?
140 F
33
When the reactor is critical both core flood tanks should be what at all times? And both the flood tank discharge vales (which are which valves?) shall be in what position at all times?
Both core flood tanks shall be operable at all time Both core flood tank discharge valves (CF-V-1A and 1B) shall be Open at all times
34
Maintain measured core flood tank boron concentration between what concentration band?
2350 and 2750 ppm
35
PPC indication of core flood tank pressure should be maintained between what pressures?
590 and 610 psig
36
Core flood tank level should be maintained between what levels whenever the reactor is critical?
11.35-11.81 FT
37
The electrically operated discharge valves from the CFT will assured open by what?
By administrative control and position indication lamps on the engineered safeguards status panel
38
Electrically operated discharge valves from the CFT, respective breakers for these valves shall be open and conspicuously marked. A how much time clock is provided to open the valve and remove power to the valve?
A one hour time clock is provided to open the valve and remove power to the valve
39
CFT vent valves CF-V-3A and CF-V-3B shall be what position and the breakers to the CFT vent valve motoro operators shall be tagged in what position?, except when adjusting core flood tank level and/or pressure?
CFT vent valves shall be closed and the breakers to the CFT vent valve motor operators shall be tagged open.
40
IF the CFT boron concentration is outside of limits, of it the TSP baskets contain amounts of TSP outside the limits specified by 3.3.1.3.b, or NaOH tank is outside the limits of 3.3.1.3.b or any manual valve in the NaOH thank discharge lines are not locked open, do what?
Restore the system to operable status within 72 hours.
41
If the system is not restored to meet the requirements of specification 3.3.1 within 72 hours, the reactor shall be placed in what condition and within how much time?
Placed in HOT SHUTDOWN condition within six hours
42
3.3.3 exceptions to 3.3.2 shall be as follows: How many CFT’s shall be what at all times? How many of the motor operated valves associated with the CFT’s shall be fully open at all times?
Both CFT’s shall be OPERABLE at all times Both the motor operated valves associated with the CFTS shall be fully open at all times
43
BASES The req’s of spec 3.3.1 assure that before the reactor can be made critical, adequate engineered safety features are operable. 1.) How many of which components are specified? 2.) However, only how many of each is necessary to supply emergency coolant to the reactor in the event of a loss-of-coolant accident. How many CFT’s are required because a single CFT has insufficient inventory to re-flood the core for hot and cold line breaks?
1.) 2 makeup pumps, 2 decay heat removal pumps, 2 decay heat removal coolers 2.) However, only 1 of each is necessary to supply emergency coolant to the reactor in the event of a loss of coolant accident. But Both CFTS are required