Main Steam Safety Valves (MSSVs)

Bases?

A

Limits 2 MSSV to 110% of design by passing 100% flow

2 MSSV limiting event - full power loss of vacuum
1 MSSV limiting event - full power FWLB in CTMT

1 - 1250#
2 - 1290#
3,4,5 - 1315#

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

3.7.2
Main Steam Isolation Valves (MSIVs)

Modes?
MSIV Operability Requirements?
Actions?

A

Mode 1, Mode 2-4 (Except when all MSIVs Closed/Deactivated)

4 MSIVs AND Actuators
Isolation times in limited (<4.6 Sec?)
Close on MSIS
Fast Closure Available
Greater than or equal to 5000# Accumulator
Air Reservoir - Adequate Press (74# - Seis Alarm)

1 MSIV Actuator - 7 days
2 MSIV (1 ACT Inop/ Diff Trains) - 72 hrs
2 MSIV (1 ACT/ Same Train) - 48 hrs
1 MSIV (Both Act) - Declare MSIV INOP
3 Actuators - Declare MSIV INOP
1 MSIV INOP - Restore 4 hrs
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

3.7.3
Main Feedwater Isolation Valves (MFIVs)

Modes?
Requirements?
Actions?
Notes?

A

Mode 1-4 (Except when MFIV Closed/Deactivated OR Isolated by MOV)

4 Economizer MFWs and 4 Downcomer MFIVs

Separate Entry allowed for each penetration

Isolation times in Limits

Auto Close on MSIS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

3.7.4
Atmospheric Dump Valves (ADVs)

Modes?
Requirements?
Bases?
Actions?

A

Modes 1-4 when S/Gs required for DHR

1 INOP on One/Both S/Gs - 7 Days
2 INOP on One/Both S/Gs - 24 hours

Bases:
C/D during SGTR
Remote OPS Required
13.3 hrs operations (4 hrs Mode 3/9.3 hrs to Mode 5)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

3.7.5

A

Auxiliary Feedwater (AFW) System

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

3.7.6

A

Condensate Storage Tank (CST)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

3.7.7
Essential Cooling Water (EW) System

Modes?
Actions?
Bases?
Component Isolation?

A

Modes 1-4 (72 hr LCO)
Mode 4 INOP- SDC INOP (3.0.6 N/A)

Cools CS for S/D and Loop
Cools Sump Fluid (LOCA)
Cools SDC (<350 F Tc to M5)

Isolate:
  SDC HX (Both SDC and EW INOP)
  Cross Tie to NC Priority Loads = EW INOP
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

3.7.8

A

Essential Spray Pond System (ESPS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

3.7.9

A

Ultimate Heat Sink (UHS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

3.7.10
Essential Chilled Water (EC) System

Modes?
Actions?
Component Isolation?

A

Modes 1-4 (72 Hr LCO)

Isolate One CLR - OK
Isolate greater or equal to 2 CLR - EC Operability depends on engineering evaluation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

3.7.11

A

Control Room Essential Filtration System (CREFS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

3.7.12

A

Control Room Emergency Air Temperature Control System (CREATCS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

3.7.13

A

Engineered Safety Feature (ESF) Pump Room Exhaust Air Cleanup System (PREACS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

3.7.14

A

Fuel Storage Pool Water Level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

3.7.15

A

Fuel Storage Pool Boron Concentration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

3.7.16
Secondary Specific Activity

Modes?
Limit?
Bases?
Actions?

A

Mode 1-4 (Less than or equal to 0.1 mCi/gm Dose Equivalent I-131)

Mode 3 in 6 hours/ Mode 5 in 36 hours

Assumption in MSLB analysis
Small fraction of offsite dose limits (10 CFR 100)

17
Q

3.7.17

A

Spent Fuel Assembly Storage

18
Q

3.7.1
Main Steam Safety Valves (MSSVs)

Modes?
Requirements?
Actions?

A

Modes 1-3
Modes 1-2 = 10 per S/G Required (ALL)
Mode 3 = 2 per S/G Required

Modes 1-2
Up to 4 INOP per S/G - Reduce Power 4 hrs AND Reduce VOPT 36 hrs
>4 INOP per S/G - Mode 3 in 6 hours

> 8 per S/G INOP - Go to Mode 4

19
Q

3.7.2
Main Steam Isolation Valves (MSIVs)

Bases (Safety Analysis)?
Limiting Accidents?

A

SLB in CTMT
Limiting Case - HZP (Most mass in S/G)
Loop/1 MSIV Fails Open

SLB in MSSS (Upstream MSIV)
Off-Site Dose Limiting (10CFR100)

SGTR
Limits Off-Site Dose
Isolates S/G for press control

Maintain SDM (Excessive C/D)

20
Q

3.7.3
Main Feedwater Isolation Valves (MFIVs)

BASES? (Safety Analysis)

A

Large SLB/FWLB

Prevent water in steam lines (Hi Level)

Prevents excessive FW to Mo Minimize RCS Cooldown