TRM Flashcards
(7 cards)
TLCO 3.0.100.3
(3.0.3 of TRM)
Applicable: Mode 1-4
Immediately:
- Notify SM
- Write CR
7hrs - Determine if we can continue operating.
Further actions from CAP/Plant Management
Charging Pumps
Modes?
Operating vs. Shutdown
Modes 1-4
Two Charging Pumps
Modes 5-6 One Pump (Charging or HPSI or LPSI)
Boration Flow Paths
Operating vs Shutdown
Modes?
Minimum paths required?
Flow Rate?
Modes 1-4 (Gravity Feed) (RWT 73% or SFP) MOV536 (RWT or SFP) HV327 (BA Filter Bypass) HV164 - (RWT 73% or SFP) MOV514 Thru CHPs to RCS (2 paths required)
Modes 5-6
Gravity from SFP to CHP to RCS
RWT to CHP,HPSI,LPSI, to RCS (1 path required)
Greater than or equal to 26 gpm - 1 CHP
Greater than or equal to 68 gpm - 2 CHP
(At NOP - 2250 PSIA)
TLCO 3.4.100
Aux Spray
Modes?
Requirements?
Bases?
Valves required to be failed open?
Modes 1-4
Both Aux Sprays Required
1 Non-Functional - 72 hrs
2 Non-Functional - 6 hrs
Then TLCO 3.0.100.3
Bases: Pressure Control/Boron Mixing
TSR- Power Available (CH-524 CH HDR/532 Locked Open RWT 73% Suction)
TLCO 3.4.102
PZR Heat Up/Cool Down Limits
Modes?
Limits?
Actions?
TSRs?
At all times less than or equal to 200F/Hr
Restore 30 minutes Engineering Eval (Per CAP)
TSRs
Monitor every 30 min during Heat Up or Cool Down
Spray Delta T when Aux Spray Cycled OR Pressurizer Spray when <4 RCPs running
TLCO 3.4.201
Pressurizer
Modes?
Requirements?
Mode 1-3
Class B/U Heaters
TSR ensures class HTRs can be powered from DGs Verify load shed and that they can be manually re-energized.
Actions:
Evaluate operability
TRM 3.7.200
Atmospheric Steam Dump Valves
N2 Tank greater than or equal to 615 psig
If NOT Met - Declare ADV Inoperable