Tech Spec 2.0 AND Misc Flashcards
(3 cards)
1
Q
Completion Time
Extension Rules
A
Applicable: 2nd train becomes INOP
- 1st/2nd exist concurrently - 2nd remains INOP after 1st restored
Total Time (Most Restrictive of):
Initial Completion time + 24 hrs.
Or
Completion time from 2nd inoperability
Does not apply to first “Once Per” actions
2
Q
LCO 2.1.1
Core Safety Limits
Actions/Modes
A
DNB 1.34
Peak Fuel <5080 (lowers 58F every 10000MWD/MTU)
Modes 1 & 2
Restore AND Mode 3 within 1 hour
3
Q
LCO 2.1.2
RCS Safety Limit
A
Applicable: Modes 1-5
RCS Less than or Equal to 2750 psia
Applicable: Modes 3-5
Restore in 5 minutes