Metro Heavy Rail Flashcards

(85 cards)

1
Q

Csx name
Marc name

A

Csx metropolitan subdivision
March Brunswick line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Define roadway (railroad emergency response manual)

A

Between fences tunnel walls 50 ft out from the center of the outward tracks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Switcher heater diseal tank

A

1000 gallons lpg

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Railroad electric signal wires up to ___ volts

A

6900 volts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Other name for highway flares

A

Fuses

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Amtrak electrified lines ___ volts can arc up to ___ ft

A

12,000 volts
3 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Marc passengers at rush hour per car
Amtrak passengers per car

A

Marc 200
Amtrak 250

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Fastest speed in metropolitan area

A

135 mph max in md

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Head end power (power to passenger cars from locomotive) ___ volts

A

480 volts- gets reduced to 220 and 110 in the individual cars

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Hand brakes are located at the ___ end of the car

A

B end

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

During emergency’s at least ___ hand brakes must be applied

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The end of the car with the handbrake is always the ___ end

A

B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Getting into Amtrak windows

A

Force INTO car

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How many passenger cars in Amtrak high speed set?

A

6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Marc recomends to open windows from ___

A

Outside

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Last resort to cut polycarbonate windows

A

Carbide tip chainsaw
DONT USE CIRCULAR SAW

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Metro front of car ___ end. Rear of car ___ end

A

Front F, rear R

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Married pairs are coupled at the ___end

A

R

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Metro car weight

A

82,500 lbs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Metro car crush load

A

232 passengers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

How to remove window in 7000 series car

A

Remove frame

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

7000 series max speed

A

75 mph

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Metro Right of Way

A

Area between fenced and tunnel walls

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Chain marker ID
A
1
Red
3
4
5
+
0
0

A

A-route ID
1- track number
Red - color line
3 -distance from hub of the line (metro center)
4
5
+
0 -34,500 ft from hub (metro center)
0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Red line A route A1 A2 Red line B route B1 B2
A route- shady grove to metro center A1-inbound to metro center A2- outbound to shady grove B line- metro center to glenmont B1- outbound to glenmont B2 - inbound to metro center REMEMBER BY 1 goes east to west 2 goes west to east
26
Tunnel safety walkways width
22 inches
27
Max travel distance to any exit shaft
1250 ft
28
Exit shafts up to ___ ft tall
220
29
Which tracks are responsibility of yard master? (OCC has no control)
YT- yard track LT- Lead track
30
Stringer power ___ volts (Connects to shoe of train in shop) Shutting down power
750 volts Controls are mounted on wall of shop (depressing red button shuts down power)
31
Three types of electrical systems in metro
Traction power system- propels cars Ac power system- lighting, ventilation etc Battery power- emergency ops
32
Traction power Substations
Convert power from PEPCO (13,800 volts) to 750 volts. Substations located ~every mile. Controlled by OCC
33
Max length of third rail
800 ft. Ensure to see how many pieces of third rail train is in contact with
34
When to press ETS (emergency trip switch) red button
IMMINENT threat to life safety
35
Steps to shut down third rail power via ets phone
Pick up phone and dial “0” Identify self with name, rank, unit numbers
36
110 volt receptacle locations
Under every other bench in station and under every other florescent light in tunnel. (If no know electric sources are available, use two volt probes to test third rail at same time)
37
Procedure for testing third rail with volt probe
Place red prong on running rail, place black prong on third rail, if light is off, test another section. REMOVE BLACK PRONG FROM THIRD RAIL FIRST
38
WSAD (warning strobe and ALARM DEVICE) procedure
Operate test switches Place box bwetween running rail and third rail with handle up Place white electrode on running rail Place red electrode on third rail Lay wsad down on back To remove REVERSE STEPS
39
Supervisory power outage Vs red tag
Supervisory outage is when contact ROCC to shut down power Red tag is for EXTENDED PERIOD OF TIME when metro employees report to substation and take breakers out
40
Stray current
When metal touches rails or cars can be up to 60 volts
41
Two conditions that could create lethal voltage
Traction substation down Yard power supplied by mainline traction power substation Because increased resistance that negative electricity has to overcome and may seal path of least resistance
42
Start up operations
new line not under revenue is being tested. ROCC has no control of third rail here. Only way to shut down is by pressing ETS button or rack out breakers at substation
43
Contact start up operations on wayside telephone dial ___
1081
44
Three types of electrical loads
Non essential (not necessary for basic operations)- heating, ac, heaters, mezzanine escalators, misc equipment Essential (required for basic operations) - vent fans, tennel vents, lighting, entrance escalators, fare collection, kiosk Emergency (absolutely necessary for safe operations)- communications, emergency lighting, train control
45
Emergency battery power in tunnels operate ___% of lighting for up to ___ hours
25% 3 hours
46
Halon suppression systems
Sensitive equipment- comms rooms, switchboard rooms, traction power rooms, battery charging rooms DONT ENTER WITHOHT SCBA
47
Standpipes in subsurface stations are ___ systems
Wet
48
Fire cabinet locations (contain hose valves) subsurface vs surface stations
Subsurface Center stations- one each side Side stations- one each side on each platform Surface Center platform- one at end Side platforms- one at end on each side
49
Standpipe outlet location
In platform floor every 200 ft
50
Standpipes in surface stations are ___ systems
Dry
51
Standpipe locations in tunnels
Accross from safety walk. Normally above third rail
52
Dry chem extinguisher locations
Operators compartment, kiosk, anxlary room, fire equipment cabinet, under ETS BOXES. Halon or co2 extinguishers in train control rooms or comm centers
53
Etec cart can carry ___ passengers on backboards Max load Max load on top tray Weight
4 people Max load 1000 lbs Top 250 lbs Weight 165 lbs
54
Panic bar at kiosk must be pressed for at least ___ seconds
15 seconds
55
WASAD chirping noise means ___ volts Light flash at ____ volts
Chirp 50 volts Light flash 450 volts
56
Crush load of an 8 car train in excess of
1800 people
57
The intent of MCFRS during metro incidents is that at the ____ min mark we will have a comprehensive understanding of the nature and scope of the problem
20 min mark
58
Initial operations should focus on quick access to the train and ____ the passengers
Reassuring
59
Rail yard incidents occur within the rail yard or on the ___ ____
Lead track
60
The ____ is the first level of the nina based grouping of incident resources
Task force
61
Met full assignment
6 engines, 3 aerials, 1 squad, 5 ems transport units, 4 command officers (2 must respond)
62
Met/rescue assignment
3 engines, 2 aerials, one squad, 2 ems units, 1 als resource, 2 command officers (one must respond)
63
If first arriving unit is a special service, they should consider passing command as early as possible, preferably to ______
2nd due engine
64
Each TF must consist of at least
One engine and one aerial
65
Entry TF
First 2 engines, aerial
66
When first engine and first truck enter the roadway before the second due engine can join the task force, the second due engine must ______ and ___
Take lookout position at entry point, outside of the roadway and await further instructions from IC
67
Point if entry task force is to make rapid access to the scene. They should only stop to ____
Provide lifesaving treatment, remove life threatening hazards, direct evacuating people to the exit
68
Once entry TF makes it to the train they should ____
Travel entire length of train and calm and reassure passengers and keep them on the train
69
Alternate entry TF should report to the ____
Next closest station
70
Who is the Metro on scene commander representing WMATA?
First metro transit police officer or responsible rail supervisor
71
When an engine establishes tactical command and have to act on an immediate life hazard, they should ____
Pass command to second due engine if they’re on the scene
72
Incidents on lead track must be coordinated with both ____ and ____
ROCC and Yard Interlocking Officer
73
Personnel must not enter roadway until _____ UNLESS there is an immediate life hazard
Clear objective for entering roadway At least one other unit on scene Third rail is confirmed down and tested locally
74
Minimum PPE for personnel operating in roadway
Duty shoes, long pants, safety vest, work gloves, eye protection, helmet
75
Personnel must NOT enter the roadway if there is ____
Sufficient smoke can’t see feet from standing position Heat or smoke of sufficient intensity that personnel must crawl
76
Safety control units
Aerials
77
There are no ETS buttons in ____
Rail yards
78
What are chemical light sticks to be used for
Identifying obstructions
79
Driver of first due engine must notify IC when/if ____
fire protection systems have been charged
80
Support TF
3rd due engine, 2nd due truck DO NOT DEPLOY WITHOUT ORDERS FROM COMMAND
81
4th engine
Base staging for EMS units
82
5th due engine
Remote water supply Communicate water supply to IC
83
6th due engine
Alternate entry point Alternate entry TF leader Report IOSR at alternate entry point
84
2nd due areal 3rd due aerial
2nd supper tf 3rd alternate entry tf
85
Squad