Project Lifecycle and Infrastructure Flashcards

(38 cards)

1
Q

What is 3D BIM?

A

Structural analysis + clash detection + detailing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is 4D BIM?

A

3D BIM + Scheduling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is 5D BIM?

A

4D BIM +costing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How much percent of the building lifecycle cost does the inital cost of a project contribute to?

A

10 to 20 %

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How much of the building lifecycle cost does facilities management contribute towards?

A

80 to 90 percent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Despite facilities management making up most of the building lifecycle cost, what has industry been typically focused on>

A

The upfront intital capital costs of construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

By shifting the focus from initial costs to the whole life cost of assets, what does it allow for?

A

Better decisions upfront in terms of cost and sustainability.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the life cycle cost analysis?

A

Intital cost, service cost, preventive maintencance cost, operating cost, disposal cost.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What does 6D BIM focus on?

A

Sustainabilty

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the motivation for β€˜nD’ BIM?

A

Focusing on the whole life cost of the projject

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is 7D BIM?

A

Facility management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is 8D BIM?

A

Safety

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

In detail, what is 6D BIM?

A

Sustainability, energy analysis of buildings.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How is 6D BIM used at the design stage?

A

Using performance data enables teams to consider the impact of their proposals, simulating costs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is 7D BIM?

A

6D BIM + facility management information

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When is 7D BIM used by managers?

A

In the operation and maintenace of the facility throughout its life cycle.

Allows participations to extract and track relevant data asset such as maintenace and warranty data.

17
Q

How is 7D BIM used during the operational stage?

A

Spend profiles can be created, helps adopt a planned and pro active approach to facility management opposed to a reactionary one.

18
Q

What is 8D BIM?

A

7D BIM + Health and safety information

19
Q

What does the SmartMarket report analyse?

A

The use of BIM for transportation infrastructue projects and the value it brings.

20
Q

For bridges, how does 8D BIM help you?

A

Anticipate issues, assess information and act more confidently at each stage of your design bridge project.

Minimised re-work

21
Q

How does 8D BIM help rail and transit?

A

Makes high speed rail design faster, more accurate and minimises disruption.

22
Q

What is a Tunnel Boring Machine Model?

A

Describes geometries, material properties and manufacturing information and machine operating data.

23
Q

What does a tunnel structure model describe?

A

Dimensions of alignment, type of material

24
Q

What does a ground model describe?

A

3D soil layer geometry, soil layer material properties, ground water level.

25
What does a built infrastructure model describe?
Dimensions of existing buildings, roads, bridges etc. Area, stiffness, mass, vulnerability.
26
What is the IFC the combination of?
Built infrastructure model, ground model, tunnel structure model and tunnel boring machine model
26
What does 'GIS' stand for?
Geographical information systems
27
What is GIS a framework for?
Gathering, managing, analysis and visualising data
27
What does the GIS include?
Maps, data, analysis and application
28
What is the map section of the geographical information system?
Geographic container for the data layers and analytics.
29
What data does the GIS include?
Imagery, features and base maps linked to spreadsheets and tables.
30
What does the analysis of the GIS include?
Evaluation of sustainablity, capability, predictions.
31
What is the difference between BIM and GIS?
BIM supplies detailed information about assets. GIS supplies information about assets in the context of the built and natural environment.
32
Why do we want to integrate GIS into BIM?
In BIM we do not have environmental data
33
How does BIM benefit from GIS integration?
Project participants have a better understanding of the impacts of decisions before, during and after the construction of a project.
34
How does GIS benefit from BIM?
In GIS systems, the proejct can be assesed at any scale. GIS helps manage and plan. BIM helps design and build.
35
What are 4 of the main benefits of using GIS-BIM?
Spatial analytics, logisitics and networks, ability to model and forecast and visualisation,
36