RC- Reactor Coolant System Flashcards

1
Q

What components make up the RCP shaft seal assembly?

A

casing, three tandem mechanical pressure reduction seals, auxiliary impeller

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Name the start permissives of the RCPs.

A

no motor fauls

oil lift flow

NC water flow

RCP seal bleed off valve full open

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are CEA pellets made of?

A

Boron Carbide

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Per tech spec, in mode 1 and 2, how many RCS loops have to be OPERABLE and in operation?

A

two

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the tech spec limit for RCS pressure?

A

2750 psia

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the heat sink to the RCS under normal operations?

A

Main steam and main feedwater systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What components make up the upper guide structure assembly?

A

CEA shroud assembly

upper guide structure support barrel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

In the reactor vessel, what allows for radial and axial expansion of the core?

A

the core support barrel assembly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the RCP trips?

A

under-voltage

over-current

coast-down

less than 600 for a few seconds during start up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Where is the primary chamber located in the steam generator and what is its purpose?

A

its in the bottom of the steam generator

part of the RCS boundary and directs flow through the steam generator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How many Fuel assemblies do the 12 finger CEAs interact with?

A

5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What components make up the core support barrel assembly?

A

Core support barrel

lower support structure and instrument nozzle assembly

core shroud assembly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How does the RCS interface with the reactor vessel level monitoring system (RVLMS)/QSPDS (SH)?

A

provides reliable (class) indication of the vessel level online and during accidents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the purpose of the anti-reverse rotation device?

A

stops a pump when it reaches zero speed so it can withstand reverse torques

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the purpose of the pressurizer heaters?

A

to boil the water to increase the mass of steam in the vapor space

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Where do the four safety valves discharge to?

A

under the water line in the RDT (reactor drain tank)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Per tech spec, How many pressurizer safety valves must be OPERABLE with lift settings between 2450-2549 psia

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

In the RCP shaft seal assembly, where does majority of the seal water flow get routed to?

A

through the auxiliary impeller to the journal bearing and lower journal bearing cavity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

In the RCS, what does the RI system control?

A

nothing. it only collects data

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What is the reactor vessel head seal drain valve? Where does it drain to?

A

When the inner reactor head o-ring starts leaking, causing an increase in pressure between the O-rings, this valve drains the coolant between the O-rings

RDT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What is the purpose of the steam generator tube sheet and U-tubes? How thick is the tube sheet?

A

separate primary from secondary sides of the steam generator

permit heat removal from the primary side without radioactive material transfer

23.5”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What is the purpose of the pressurizer spray system?

A

to reduce pressure by condensing steam in the vapor space of the pressurizer using subcooled water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What is the design pressure and temperature of the steam generator primary chamber?

A

650*F

2500 PSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Which type of CEA do the shutdown banks A and B use?

A

12 finger only

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
How does the RCS interface with the SI system?
emergency core cooling and boron injection for reactor shutdown long and short term cooling
26
Why is a steam generator tube rupture bad?
reactor coolant would be leaking into the main steam system allowing passage of radioactive material
27
What are the internals of the reactor vessel?
core support barrel assembly and the upper guide structure assembly
28
What acts as a surge volume to minimize pressure changes during load transients?
pressurizer
29
What system injects water at 6.6 gpm to the RCP shaft seal assembly?
charging
30
Are the reactor coolant pumps powered from class or non-class ?
non-class
31
What is the purpose of the RCP motor flywheel?
increases rotating inertia of the RCP which increases coast down time during LOP to pump motors
32
What is the tech spec range for pressurizer pressure?
2130-2295 psia
33
How many heaters are in the proportional pressurizer heater banks?
3 each
34
What maintains the RCS in a sub-cooled condition?
the pressurizer
35
What is the purpose of the reactor vessel?
contains the core and vessel internals directs flow of coolant through the core part of RCS pressure boundary to prevent fission product release
36
What happens if the RDT (reactor drain tank) is over pressurized by up to 10 psi? Over 10 psi?
tank reliefs to gaseous radwaste tank relieves to containment through a rupture disk
37
What prevents the RCS from over pressurizing?
the pressurizer
38
What is the RCP oil lift pump auto feature?
prior to stopping RCP, oil lift pump handswitch must be put to auto-- RCP will stop, oil pump will turn on until operator secures handswitch
39
What two sections of the steam generator interfaces with the RCS?
primary chamber tube sheet and U-tubes
40
Where does the pressurizer surge line connect the pressurizer to?
loop 1 hot leg
41
Why won't the main spray flow function without the RCPs in service?
reactor vessel differential pressure isn't sufficient to maintain spray flow without the RCPs
42
What is the total flow through the RCP shaft seal assembly?
22.6 gpm
43
describe the construction of a fuel rod
filled with uranium pellets with a compression spring and spacer disks at each end of a zirconium alloy tube seal welded with end caps and pressurized with helium
44
What are the major components of the fuel assemblies?
fuel spacer grids upper end fitting hold down plate lower end fitting guide tubes fuel rods
45
How does the RCS interface with the SE (Ex-core neutron monitoring)system?
monitors neutron flux from detectors outside the vessel
46
What is the RCS safety limit pressure?
2750
47
what is the normal RCS pressure?
2250
48
What minimizes leakage along the RCP shaft, also being an RCP boundary?
shaft seal assembly
49
Describe the sealing mechanism between the reactor vessel and the closure head.
two silver plated inconel, self- energizing, metal O-rings sit in machined grooves on the closure head flange. the outer o-ring is passive until the inner o-ring fails
50
Why are the fuel pellets "dished" at the ends?
account for thermal expansion and fuel swelling
51
What is the main flow path of the coolant within the reactor vessel?
through inlet nozzles, down between vessel wall and core barrel, through flow skirt section and into lower plenum, up through core to outlet region, through CEA shroud tubes and through outlet nozzles
52
What do the four spring loaded safety valves on the pressurizer do?
prevent the RCS from reaching safety limit pressure
53
How does the RCS interface with the NA system?
powers reactor coolant pumps
54
In reference to the reactor vessel head, what is a self-energizing o-ring?
the O-rings are drilled around the inside allowing RCS pressure to pressurize the o-ring and form the seal
55
How does the RCS interface with the SS (primary sampling) system?
samples PCS loop 1 hot leg, surge line, and pressurizer steam space used for chemistry and boron control
56
Per tech spec, in mode 3, how many RCS loops must be OPERABLE and in operation?
1
57
How many fuel assemblies do the four finger CEAs interact with?
1
58
What components make up the RCP oil lift system?
oil reservoir, filter, accumulator and oil lift pump
59
How many of the pressurizer heater banks are back ups? How many proportional banks are there?
6 2
60
What discharges from the RCS does the CH system collect?
drainage for maintenance RCP seal bleed off Primary safety valve discharge identified leakage
61
What pressures are associated with the main spray flow control valves?
start to open at 2275 full open at 2300
62
How many spray heads are there for main spray and aux spray?
they share one spray head
63
In the RCP shaft seal system, where is leakage past the vapor seal directed to?
Reactor Drain Tank
64
How many heaters are in the back up pressurizer heater banks?
banks B1 and B2 each have 3 banks B3, 4, 5, and 6 all have 6 heaters each
65
describe auxiliary spray in the pressurizer
water supplied from charging pumps two solenoid valves to control flow
66
What is the purpose of the pressurizer surge line?
flow path for coolant surging to or from pressurizer transmits pressurizer pressure to entire RCS
67
How does the RCS interface with the CEDMCS system?
CEDMCS controls the direction, rate, and duration of CEA's also controls the magnetic jack coils to CEDM's
68
Which type of CEA do the regulating groups use?
12 and 4 finger
69
What are the primary functions of the reactor coolant pumps?
RCS boundary provide flow in RCS add heat to primary loop during plant heat ups provide motive force for main spray valves
70
Where are the pressurizer heaters powered from?
two back up banks are class powered from PGA/PGB all other heaters are powered from NG
71
How many CEA's are in the core?
89 total
72
In the reactor vessel, what purpose does the core bypass flow serve?
prevents stagnation of water in low flow areas keeps primary coolant below saturation temp removes gamma radiation heat from core support barrel
73
When does shutdown cooling provide long term cooling?
after a LOCA
74
If the pressurizer spray valve bypass valves are NOT isolation valves, what are they?
metering valves
75
How many pressurizer heaters are there? How many banks are they divided into?
36 8
76
How does the RCS interface with the RI (Fixed in-core instrumentation system, or FICS)?
measures neutron flux, coolant temp. in 61 locations monitors core characteristics to assure we do not exceed allowable limits
77
What affect does the data collected from the surveillance capsule assemblies have on the plant?
Can have an effect on allowable heat up and cool down rates and the minimum temperature for reactor vessel pressurization
78
Per tech specs, in mode 4, how many SDC loops must be OPERABLE? How many in operation?
2 1
79
Describe Main spray in the pressurizer
subcooled water is supplied from the cold leg of the reactor flow is controlled by diaphragm valves
80
How does the RCS interface with the SG (main steam) and FW (feed water) systems?
remove heat from RCS
81
Will the seal bleedoff isolation valves close while the RCP is running?
no
82
why is maintaining constant main spray valve bypass flow important?
minimizes thermal shock on pipes, valves and spray nozzle minimizes thermal stratification in piping keeps chemistry uniform throughout RCS and pressurizer
83
There are 48 of which CEAs?
12 finger full strength
84
Can CEA motion be controlled automatically or manually?
both
85
How is main spray bypass flowrate controlled?
manually adjusted to establish a temp differential of less than 70* between cold leg and spray nozzle piping
86
What is the tech spec Tcold RCS loop temperature limit?
545*F
87
What are the three main purposes of the RCS?
transfer thermal energy to the S/G secondary barrier to the release of fission products provide core cooling during all normal plant conditions
88
In the RCP shaft seal system, what is the pressure drop across each of three seals?
42% of system pressure for first two seals, 16% across third seal
89
Why are fuel rods pressurized with helium?
improve thermal conductivity of pellet to clad gap prevent clad collapse
90
When does SDC provide cooling for the reactor?
When the S/G's are unavailable
91
Why is Aux spray more effective than main spray?
charging water is 110* less than cold leg temp (555*).
92
There are 28 of which CEA's?
four finger full strength
93
Where can I get samples of the RCS?
Loop 1 hot leg Surge line Pressurizer steam space
94
How does the RCS interface with the NC system?
intermediate barrier between RCS and the PW system provides cooling to the RCP motor air cooler, lube oil cooler, thrust bearing lube oil cooler, and seal coolers
95
In the reactor vessel, what supports the upper ends of the fuel assemblies and protects the CEAs from coolant cross flow?
the upper guide structure assembly
96
What are the three types of CEAs and how many are there of each?
5 regulating groups (1, 2, 3, 4, 5) 2 shut down groups (A and B) 2 part strength groups (P1 and P2)
97
What is the difference between a steam generator tube rupture and a primary leakage?
S/G tube rupture is when the tube penetration is bad enough that the CVCS can't maintain pressurizer level primary leakage is when the CVCS can maintain pressurizer level
98
What is the purpose of the RCP oil lift system?
provides forced lubrication to the thrust bearing
99
How long before an RCP start is its respective oil lift pump started and why? how long after start up will the oil lift pump run?
7 minutes before so the oil can push the thrust bearing pads away from the thrust runner 2 after
100
What do the surveillance capsule assemblies do?
monitor radiation induced changes in vessel materials
101
There are 13 of which CEA's?
four finger part strength
102
How many kW are each of the pressurizer heaters rated at?
50
103
How does the RCS interface with the CH system?
maintains pressurizer level, chemistry control, boron concentration provides RCP seal injection collects RCS discharges supplies aux spray to pressurizer when normal spray path unavailable purifies RCS
104
How does the RCS interface with the IA system?
supplies control air to the pressurizer spray valves, controlled bleed-off containment isolation valves, and RDT bleed-off isolation valves
105
How can the pressurizer heaters be controlled?
automatically by the pressurizer pressure control system manually by operator