Rolling SE Flashcards
_ Line
What does the manual straightedge need to be checked with BEFORE calibration testing can begin?
String Line for accuracy
Center _
What is the FIRST step when starting a rolling SE as it relates to checking the equipment?
Make sure the CENTER wheel moves up and down FREELY.
_/16 shim
What size shim do you first place under the CENTER wheel?
(Check HIGH Side)
3/16 inch shim
Not 3/16 inch shim
What size shim do you place SECOND underneath the CENTER wheel?
(Check HIGH Side)
3/8 inch shim
What do you repeat (same as high side) BUT to check the LOW side of the scale?
Place the 3/16 and 3/8 inch under the outer wheels to check the LOW side of the scale.
Do you use an MSE or an RSE to check construction joints?
An MSE
_ inch(s) on NON_NEW pavement side
How much overlap do you have when using the MSE on a construction joint?
1 Inch on the NON-NEW pavement side.
At what measurement MUST you mark deficiencies when SE?
When deficiencies EXCEED 3/16 inches.