SOG’s Chapter 1-Safety Flashcards
(31 cards)
What is the purpose of the Personnel Accountability System?
The purpose of the Accountability System is to account for all firefighters operating within the hazard zone of an incident.
The hazard zone is defined as?
Any area that requires SCBA or in which a firefighter is at risk of becoming lost, trapped, or injured by the environment or structure.
Hazard Zones includes but not limited to the following:
•Any structure reported to be on fire
•Areas in proximity to a structure fire during exterior ops
•A structure undergoing overhaul after a fire
•Confined space incidents
•Trench collapse incidents
•Collapse buildings
• Metro and heavy rail incidents
The Personnel Accountability System begins when?
It begins when members assume duty on an emergency response vehicle and place their Personnel Accountability Tag(PAT) on the Unit’s Unit Designation Card(UDC)
The ______ shall begin tracking units assigned to the incident the moments units are dispatched and continue until the incident has been mitigated, and the incident Commanders determined tracking is no longer necessary.
The First Due Chief
The minimum crew operating in a hazard zone shall be ___ FF equipped with ______?
Two Firefighters, equipped with portable radios.
All personnel shall be in contact with their OIC by either :
•Voice
•Touch
•Sight
•Portable Radio
Personnel Accountability Tags Color Codes:
White: Officers &PIO
Yellow:Firefighters
Orange:EMS
Blue:Fire Inspector
Red: Other members as directed by the Fire Chief
In the event a member does not have his/her PAT( lost,stolen, forgotten) his/her_________ shall be used in place of the PAT. Journal entry shall be made by Platoon Commander
Official Fire Department ID card
The Unit Designation Cards are approximately:
3”X4 1/2 plastic cards imprinted with the unit number
Where is the UDC located on the apparatus?
The UDC is located on a hook inside the cab on the officer’s side of the apparatus.
What are the Color Designation of UDC’s
Red: Engine Company
Green: Truck Company
Black: Rescue Squad
Orange: EMS Units: BLS and ALS units
Gold: Chiefs, EMS Supervisor, Haz-Mat, Fire Boat,Air Unit and other units.
Unit Designation Card will be considered part of the _____?
Apparatus Inventory
Initial unit accountability will be required within ___ min after the arrival of the first company on scene.
10min
A formal “ Roll Call” to account for each individual on the fire ground will be conducted at the ___min interval of the incident, and at each subsequent 20min interval
20 minute interval
A unit or crew cannot be contacted in the hazard zone after ___ consecutive attempts by radio contact:
3 consecutive attempts
Levels of Accountability
Level I company Officer shall insure that all PAT’s on the UDC reflect the names of all personnel assigned to that unit
Level II All UDC’s are to be collected from the apparatus and delivered to the command posts
Level III ENTRY CONTROL- Incident Commander determines that more stringent accountability is required
Anytime Level III accountability has been ordered, the IC will notify OUC to sound a _______ alert tone on the incident talk group.
Two-second alert tone
The term_____ is the international distress signal and shall only be used when a member is in trouble and needs immediate assistance
MAYDAY
Individual declaring a “MAYDAY” will:
Activate the orange “Emergency Activation” button located on the top of the portable radio.
•Depressing this button will cause the radio to emit a set of four-high pitched tones, and the word “ Emergency” will be displayed on the radio’s LCD display and at OUC
The individual declaring a MAYDAY will have to push the push-to-talk button, that will activate all other radios that are on the same channel and will show_______?
Emergency Recieved
Pushing the orange “ Emergency Activation” button gives this radio priority over all other radios except the ______ and ______
incident Commander or the OUC
The acronym that should be use to give pertinent information during a “MAYDAY”
L-Location
u-Unit assigned
N-Name
A-Air status of SCBa
R-Resources needed to mitigate emergency
During a MAYDAY Command shall order all radio traffic to cease except
EMERGENCY TRAFFIC