SOG’s Chapter!3-Size Up Flashcards

(19 cards)

1
Q

What is a Size-up?

A

Size-up is the exchange of information that helps depict an image of unfolding events

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Size-up can be divided into following categories:

A

Exterior
Interior
C.A.N(Conditions,Actions,Needs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The report of conditions on arrival is the ____ size-up

A

On scene size-up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The first arrival units both the front and rear of the addresses shall give an _____ size-up that includes the following:

A

Exterior size-up that includes

•Unit Name
•Corrected Address
•Side of the building
•Types of Construction
•Building Oocupancy
•Configuration
•Dimnesions
•Critical Info
•structural emergencies
•Special Hazards
•Lightweight Construction
•Announcer the strategy when determined to go defensive
•Request additional resources
•Establish Command if 1st arriving company officer
•Provide status of 360

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the sides of the building?

A

Alpha
Bravo
Charlie
Delta

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

If the building is not a standard configuration the _____ company shall designate the A-alpha side.

A

First company

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Building Height- on the reporting side of the building shall be given in ___

A

Stories

•Stories - Is the number of floors above ground

•Floors- Is designated number, consistent with that living space

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Building Occupancy

A

Describes what the building is being used for as the main occupancy.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Configuration:

A

Is the structural design of the building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Type of Construction:

A

Is the general classification of construction type

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Dimensions:

A

Shall be given for buildings that are very large, such as a warehouse.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The dimensions are an estimate of the outside footprint of the structure and shall be given in ____

A

Feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Conditions on Arrival:

A

Shall be a general description of what is observed on arrival.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Critical Information:

A

Shall be any info that might be relevant to mitigation of the emergency.

17
Q

Offensive Strategy

A

An incident where members will be operating (in full PPE/SCBA) inside of a structure with an IDLH atmosphere present.

18
Q

Defensive Strategy

A

An incident where operations are limited to the exterior of a structure and outside of the established collapse zone.

19
Q

Investigation Mode

A

An incident where no IDLH atmosphere is present and requires further investigation, prior to deploying additional resources.