Weapons Assembly Flashcards Preview

march 2016 exam > Weapons Assembly > Flashcards

Flashcards in Weapons Assembly Deck (27):
1

The plastic shipping plugs are removed from the nose well and the tail fuze cavity of MK 80 GP bombs at which of the following times

During depalletizing procedures

2

What is the indication of the FMU-139 series fuze when the saving pin is removed and the red and black striping is visible on the gag rod sleeve

Fuze is enabled and could be armed

3

What is the proper orientation of an MK 122 arming safety switch coaxial cable when installed in the BLU-110

All answers are correct
A. Left angle to the lugs
B. Forward of the lanyard
C. 45 degree angles to the lugs

4

When tightening the clamp bolt of the BSU-33 fin to the bomb body what must you ensure

The fin clamping ring contacts within V-groove of bomb body 360 degrees

5

What component retains the firing pin assembly of the MK 76 practice bomb

A cotter pin

6

Where is the MK 89 spotting charge adapter installed in the BDU-45

Bomb tail well

7

What is the acronym GBU

Guided bomb unit

8

What is the first inspection step you must perform on the MXU-667 AFG once you have removed it from its container

Verify safety pins and streamers are installed in latch release lever and collar of wing assembly

9

What must you care about when exercising the PRF switches on the MAU-169 , MAU-209 , and WCU-10

That switch stop limits are not exceeded

10

A complete JDAM guidance set consists of a tail assembly and _______ assembly

Aero surface

11

When inspecting the CBU-99 fin release band for installation of safety cotter pin what must you ensure

Safety cotter pin prong is bent to 15-30- degree angle

12

Before a reusable rocket launcher is loaded onto an aircraft , it should be sent to AIMD for which of the following reasons

An electrical checkout

13

When a rocket warhead is inspected , what maximum amount of gap , if any , is allowed between the fuze adapter and the warhead

No gap is allowed

14

Which of the following devices should be in place whenever a rocket motor is removed or protrudes from a rocket launcher

A shielding band

15

When inspecting the SLAM-ER in the shipping container , you must inspect the interior for any evidence of damage , engine oil , fuel , ______or _______

Battery electrolyte , loose hardware

16

What primary factor dictates the way a weapon is to be configured

The mission requirements

17

what provides detailed information for weapons uncanning/recanning and inspection , component unpackaging/inspection , repackaging and weapons assembly , and inspection criteria for assembled weapons

airborne weapons assembly manual (WAM)

18

regardless of how well trained an assembly crew may be , there must always be a team leader (TL) , a quality assurance (QA) inspector and what other member

safety observer (SO)

19

the designated bomb assembly areas on the amphibious assault ship (general purpose) (LHA) and the multi-purpose amphibious assault ships (LHD) class is normally located on what deck (aviation ordnance/bomb assembly magazine) or other designated assembly areas depending on the class of ship

5th

20

what is the term used to define the physical removal of ammunition from the magazine

breakout

21

weapons are broken out , by direction of whom , in accordance with the load plan

Ordnance Handling Officer (OHO)

22

bombs , with more than 56 square inches of thermally protected , and are restricted from use afloat

15

23

the navy currently used what series of electronic bomb fuze

FMU-139

24

when stored in original shipping/storage container , the shelf life of BSU-85 fins is how many years

20

25

unless the BSU-86 fin is used on MK 82/BLU-111 live loaded tactical Depth bomb , ensure that the eight set crews are made of what

steel

26

the practice bombs normally used on a routine basis are the MK 76 Mod 5 and what else

BDU-48

27

don't make changes or additions to any ordnance or ordnance components without explicit authority from the what

Naval Air Systems Command