24 Electrical Flashcards

1
Q

What voltage does the DC system operate to?

A

28V DC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does the GALY and CAB pb control?

A

Power to the main and secondary galley

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What frequency does the AC system operate to?

A

400Hz

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What voltage does the AC system operate to?

A

115/200V AC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How much power is generated by the generators?

A

90 KVA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How many phase is the electric supply?

A

3 phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When does the IDG temperature on the ELEC SD page turn amber?

A

Above 185 degC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What does the commercial pb control?

A

Commercial electric loads:

  • Cabin and cargo lights
  • Water and toilet system
  • Drain mast ice protection
  • Galleys
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What does the GEN 1 LINE pb do?

A

Isolates GEN 1 from AC BUS 1

The number 1 fuel pumps in both inner tanks are now connected directly to GEN 1 (normally to AC BUS 1)

Used for smoke drill, sourcing smoke

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When does the IDG temperature generate an advisory?

A

Above 147 degC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Approximately how long after APU shut down does it take for the APU intake flap to fully close?

A

2 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the power of the emergency generator?

A

5 KVA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the tolerances for amber values on the generators? (Load/Voltage/Frequency)

A

Amber when:
>100% load
>120V or <110V voltage
>410Hz or <390Hz frequency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When do the battery DC voltage and current indications on the ELEC SD page turn amber?

A

> 31V or <25V

>5A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When are the main galleys shed?

A

When only one generator is operating in flight

or on the ground when the aircraft is being supplied by 1 engine generator only

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

After the loss of AC BUS 1 and 2, how long does it take for RAT extension and emergency generator coupling?

A

8 seconds

17
Q

What restrictions are there on the operation of the red guarded IDG pb?

A

Do not press for more than 3 seconds as it may damage the disconnect mechanism. The IDG should only be disconnected on a running or windmilling engine.

18
Q

What happens if AC BUS 1 and 2 are lost simultaneously?

A

Emergency Electrical Configuration

If the aircraft speed is over 100 knots:

  • RAT extends
  • Emer gen driven by blue hydraulic system
  • Emer gen connects to electrical network once operational (within tolerances)
19
Q

What is the AC ESS FEED pb used for?

A

If AC BUS 1 is lost, then the AC ESS and DC ESS (via TR1) are also lost. AC ESS FEED allows AC BUS 2 to power the AC ESS BUS, and subsequently DC ESS BUS via the ESS TR.

This procedure is shown on ECAM during the AC ESS BUS FAULT

20
Q

Which screens are lost in an AC BUS 1 FAULT?

A

Captain PFD, ND and EWD (Upper DU)

21
Q

Which screens are lost in an AC BUS 2 FAULT?

A

FO PFD, ND and SD (Lower DU)

22
Q

Which screens are lost in EMER ELEC?

A

FO PFD, ND and SD (Lower DU)

23
Q

What is the normal configuration of the electrical system?

A

GEN 1 supplies AC BUS 1, which supplies AC ESS BUS and TR 1. This supplies DC BUS 1 , which supplies DC BAT BUS and DC ESS BUS.

GEN 2 supplies AC BUS 2, which supplies TR 2. This supplies DC BUS 2.

The two batteries are connected to the DC BAT BUS, and will be disconnected by the BCL when fully charged.

24
Q

What is the reconfiguration of the electrical system in an AC BUS 1 fault?

A

AC BUS 1 is no longer supplied, which leaves the AC ESS BUS, TR 1, and subsequently DC BUS 1, DC BAT BUS, and DC ESS BUS without power.

In this situation, the AC ESS FEED pb can be pressed, to supply AC ESS BUS from AC BUS 2. AC ESS BUS then supplies the ESS TR, which supplies the DC ESS BUS.

DC BUS 2 supplies DC BUS 1 and DC BAT BUS automatically after 5 seconds

25
Q

What is the reconfiguration of the electrical system in a single TR fault?

A

The ESS TR automatically replaces the faulty one through the AC ESS BUS, and powers the DC ESS BUS. DC BUS 2 powers the DC BAT BUS and DC BUS 1 (in a TR1 fault)

26
Q

What is the reconfiguration of the electrical system in a double TR fault?

A

The ESS TR powers the DC ESS BUS from the AC ESS BUS. As both TRs are lost; DC BUS 1, DC BUS 2, and the DC BAT BUS are lost.

27
Q

What is the difference between emergency electrical configuration (loss of both generators) and the smoke configuration?

A

They are the same, except in the smoke configuration the number 1 fuel pumps in both inner tanks are connected upstream of the GEN 1 line connector (i.e. directly to GEN 1)

28
Q

What is the configuration of the electrical system in emergency electrical configuration in flight?

A

The EMER GEN (RAT, blue hydraulic system) supplies the AC ESS BUS, and the ESS TR. This supplies the DC ESS BUS.

29
Q

What is the configuration of the electrical system in emergency electrical configuration if the RAT stalls or on the ground below 100 kts?

A

The EMER GEN has nothing to drive it. The batteries supply the electrical system via the static inverter. AC SHED ESS BUS and DC SHED ESS BUS are lost.

30
Q

What happens below 50 kts on the ground in the emergency electrical configuration?

A

The AC ESS BUS is automatically shed, leading to the loss of all DUs.